|
|
July, 2005
|
First run in canyon -
Other work done at Brightside |
June,
2005 - Pt2
|
Move to Niles Canyon |
June,
2005
|
Final touches |
May,
2005
|
Almost finished! - Nose
gets painted |
April,
2005
|
Left side silver paint |
March,
2005
|
Pilot paint - right side
silver paint |
February,
2005
|
Brake rebuild - Nose
bondo work |
January,
2005
|
Brakes - trucks - headlight
- herald |
December,
2004
|
Fuel tank skirts - number
boards - nose bondo |
November,
2004
|
Radiator grills - paint
stripping on nose |
October,
2004
|
Right side orange paint |
September,
2004
|
Back end repaint |
August,
2004
|
Right side rear panel
paint - cab roof paint - pilot / anticlimber paint |
July,
2004
|
left side panel replace
- front coupler |
June,
2004
|
Pilot primed |
May,
2004
|
Right side reassembly
- left side disassembly - pilot installation - plymetal building |
April,
2004
|
Plymetal - brakes - pilot
work |
March,
2004
|
Pilot work - general
body work |
February,
2004
|
Side panel work - Nose
metal work - pilot work |
October
2003
|
General body work - (NP) |
June
2003
|
Right side panels
- Nose repair work - test run |
May
2003
|
Right side panels |
April
2003
|
Pilot removal - Plymetal
work |
March
2003
|
Radiator grills |
February
2003
|
Horns - generator
brushes (NP) |
January
2003
|
Right side grills and
upper panels |
December
2002
|
Radiators - shutter cylinders |
November
2002
|
First plymetal panel
- test run |
October
2002
|
Roof hatch replacement |
September
2002
|
Shutter work |
August
2002
|
Roof hatch work - shutter
work (NP) |
July
2002
|
Roof hatch work
- radiator fan work (NP) |
June
2002
|
Roof hatch removal |
May
2002
|
Right side panel dissasembly
- Rust discovered! |
April
2002
|
Intro photos |
|
|