TrainWeb.org Facebook Page
918 October 2003 update
918
October 2003 Update

During the last couple months a few of us (including myself) took some extended breaks for various reasons, although I think Don and Jon kept at it the whole time...

Current projects include:

-Patch and fill rust holes on lower parts of the nose and cab sides. Most of the metal work is done, body filler work is in progress.

-Waiting for some rolled steel for the pilot. The upper curved sections are being made by a metal shop and should be ready soon.

-Upper panels from the fireman's side have been repaired and repainted. They are ready to go back up. After that, the middle panels will come down for repairs and paint. The plymetal panels are being constructed right now.

-Brake rigging on the front truck is being removed for repairs. 

Photos soon...


 
 
 


Back