A |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Acton |
Kitchener / Georgetown (CNR Guelph Sub / Note: now GEXR Guelph Sub) |
Train & Bus |
35.6 |
46158 |
Acton |
started 26 Oct 1991 Trains 145/6
ended 03 Jul 1993 account gov't cutback returns to 1990 route out of
Georgetown
now back in service
|
Agincourt |
Stouffville (CNR Uxbridge) |
Train
|
55.5 |
41808 |
Agincourt |
- |
Ajax North |
Lakeshore (GO Sub) |
Train & Bus
|
3.5 |
- |
Ajax North |
- |
Aldershot |
Lakeshore (CNR Oakville) |
Train & Bus
|
34.6 |
44540 |
Aldershot |
- |
Allandale Waterfront |
Barrie (CNR Newmarket) |
Train & Bus
|
62.8 |
51175 |
Allandale |
- |
Appleby |
Lakeshore (CNR Oakville) |
Train & Bus |
27.9 |
- |
Appleby |
Sep 1988 opened
platform rehabilitation Summer 2002 |
Aurora |
Bradford (CNR Newmarket) |
Train & Bus
|
29.9 |
42112 |
Aurora |
- |
Back to top |
B |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Barrie |
Barrie (CNR Newmarket) |
Train & Bus |
63.0 |
51304 |
Barrie |
started 17 Sep 1991 Trains 190-1
ended 03 Jul 1993 account gov't cutback returns to 1990 route out of
Georgetown Note: 190-1 listed as 'Barrie Corridor', with cutbacks,
returns to Richmond Hill Corridor
Now back in service |
Bloor |
Kitchener / Georgetown (CNR Weston) |
Train |
4.0 |
- |
Bloor |
platform rehabilitation Summer 2002 |
Bradford |
Bradford (CNR Newmarket) |
Train & Bus
|
41.5 |
51182 |
Bradford |
| - |
Bramalea |
Kitchener / Georgetown (CNR Weston) |
Train & Bus |
11.6 |
42214 |
Bramalea |
platform shelters installed Feb 1984
new pedestrian tunnel scheduled for completion May 15 2002 |
Brampton |
Kitchener / Georgetown (CNR Weston) |
Train & Bus
|
15.4 |
42210 |
Brampton |
platform shelters installed Feb 1984
platform rehabilitation Summer 2002 |
Bronte |
Lakeshore (CNR Oakville) |
Train & Bus |
24.7 |
(43650) |
Bronte |
Jan 1967 stn constructed
no under-/overpass passengers had to use grade crossing protection
until 1977
new station constructed 1977 with pedestrian underpass under both
mainlines
plans cancelled 31 Oct 1977 with opening of Oakville West July 1977
platform rehabilitation Summer 2002 |
Burlington |
Lakeshore (CNR Oakville) |
Train & Bus
|
31.5 |
(44660) |
Burlington |
no under/overpass passengers had to use grade crossing protection
until 1993
Jun 1993 pedestrian tunnel added
platform rehabilitation Summer 2002 |
Back to top |
C |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Centennial |
Stouffville (CNR Uxbridge) |
Train
|
48.5 |
| Centennial |
05 Sep 2002 offical opening |
Clarkson |
Lakeshore (CNR Oakville) |
Train & Bus |
16.7 |
(80) 43630 |
Clarkson |
Dec 1966 stn constructed
1977 pedestrian underpass & passenger canopies for south
platform |
Cooksville |
Milton (CPR Galt) |
Train & Bus |
15.4 |
3213 |
Cooksville |
constucted 1980, finished 1981
offically opened 25 Oct 1981
platform rehabilitation Summer 2002 |
Back to top |
D |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Danforth |
Lakeshore (CNR Kingston) |
Train |
328.6 |
42432 |
Danforth |
Jan 1967 stn constructed
platform shelters installed Feb 1984 |
Dixie |
Milton (CPR Galt) |
Train & Bus
|
12.4 |
3212 |
Dixie |
constucted 1980, finished 1981
offically opened 25 Oct 1981
platform rehabilitation Summer 2002 |
Downsview Park |
Barrie (CNR Newmarket) |
Train & Bus
|
- |
- |
Downsview Park |
- |
Back to top |
E |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
East Gwillimbury |
Bradford (CNR Newmarket) |
Train |
- |
- |
East Gwillimbury |
Dec 1966 stn constructed
new pedestrian underpass under three mainline tracks
1977 erect canopy & passenger shelters north platform |
Eglinton |
Lakeshore (CNR Kingston) |
Train |
323.2 |
(203) |
Eglinton |
Dec 1966 stn constructed
new pedestrian underpass under three mainline tracks
1977 erect canopy & passenger shelters north platform |
Erindale |
Milton (CPR Galt) |
Train & Bus |
18.1 |
3215 |
Erindale |
constructed & finished 1981
offically opened 25 Oct 1981
was 7th & last station built for GO on Galt
platform rehabilitation Summer 2002 |
Etobicoke North |
Kitchener / Georgetown (CNR Weston) |
Train
|
11.0 |
- |
Etobicoke North |
platform shelters installed Feb 1984
platform rehabilitation Summer 2002 |
Exhibition |
Lakeshore (CNR Oakville) |
Train
|
2.0 |
43319 |
Exhibition |
1966-97 pedestrian overpass
Oct 1997 pedestrian underpass, station renovation, improved platform
& shelters
March 1998 underpass opened, rest of renovations completed August 1998
platform rehabilitation Summer 2002 |
Back to top |
F-G |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Georgetown |
Kitchener / Georgetown (CNR Halton) |
Train & Bus |
23.5 |
42202 |
Georgetown |
shared facilities with VIA in origianl GTR/CNR station |
Gormley |
Richmond Hill (CNR Bala) |
Train & Bus |
27.3 |
51386 |
- |
- |
Guelph |
Kitchener / Georgetown (CNR Guelph Sub / Note: now GEXR Guelph Sub) |
Train & Bus |
48.8 |
46170 |
Guelph (Centre)
|
started 26 Oct 1991 Trains 145/6
ended 03 Jul 1993 account gov't cutback returns to 1990 route out of
Georgetown
Now back in service |
Guildwood |
Lakeshore (CNR Kingston) |
Train |
321.2 |
(291) 41796 |
Guildwood |
Dec 1966 stn constructed
1977 pedestrian underpass & passenger canopies for north
platform |
Back to top |
H |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Hamilton GO Centre |
Lakeshore (CPR Hamilton) |
Train & Bus
|
57.5 |
3480 |
Hamilton (Centre) |
Back to top |
I-J-K |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Kennedy |
Lincolnville (CNR Uxbridge) |
Train & Bus
|
- |
- |
Kennedy |
- |
King City |
Bradford (CNR Newmarket) |
Train & Bus
|
22.7 |
(42118) |
King City |
- |
Kipling |
Milton (CPR Galt) |
Train & TTC Subway, Bus |
9.7 |
(3206 Obico) |
Kipling |
constucted 1980, finished 1981
offically opened 25 Oct 1981
only GO train stop on Galt with direct connection to TTC
platform rehabilitation Summer 2002 |
Kitchener |
Kitchener / Georgetown (CNR Guelph Sub / Note: now GEXR Guelph Sub) |
Train & TTC Subway, Bus |
- |
62.7 |
Kitchener |
- |
Back to top |
L |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Langstaff |
Richmond Hill (CNR Bala) |
Train & Bus
|
18.3 |
- |
Langstaff |
constructed Oct 1977, finsihed May 1978 |
Lincolnville |
Lincolnville (CNR Uxbridge) |
Train & Bus
|
- |
39.0 (some 38.8) |
Lincolnville |
- |
Lisgar |
Milton (CPR Galt) |
Train & Bus
|
|
25.2 |
Lisgar |
construction begins Fall 2005 for 2007 opening |
Lorne Park |
Lakeshore (CNR Oakville) |
Train |
- |
- |
- |
Oct 1966 to be station with Clarkson in "skip-stop operation"
no under-/overpass passengers had to use grade crossing
protection |
Long Branch |
Lakeshore (CNR Oakville) |
Train |
9.6 |
(261) (43352) |
Long Branch |
Dec 1966 stn constructed
1977 pedestrian underpass & passenger canopies for south
platform |
Back to top |
M |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Malton |
Kitchener / Georgetown (CNR Weston) |
Train & Bus |
14.7 |
(42215) |
Malton |
- |
Maple |
Bradford (CNR Newmarket) |
Train & Bus
|
18.3 |
42122 |
Maple |
shared facilities with VIA in origianl GTR/CNR station |
Markham |
Stouffville (CNR Uxbridge) |
Train & Bus
|
47.0 |
41822 |
Markham |
rehabilitation of station scheduled for completion Fall 2002 .
completed lated Nov 2002, offical opening 02 Dec 2002 |
Meadowvale |
Milton (CPR Galt) |
Train & Bus |
23.1 |
3218 |
Meadowvale |
constructed 1980, finished 1981
offically opened 25 Oct 1981
expanded to "gateway terminal" March 1991
platform rehabilitation Summer 2002 |
Milliken |
Stouffville (CNR Uxbridge) |
Train |
52.7 |
4644 / 41812 |
Milliken |
- |
Milton |
Milton (CPR Galt) |
Train & Bus
|
31.2 |
3219 |
Milton |
constructed 1980, finished 1981
offically opened 25 Oct 1981
platform rehabilitation Summer 2002 |
Mimico |
Lakeshore (CNR Oakville) |
Train |
6.7 |
(43334) |
Mimico |
old GTR/CNR Mimico stn mileage 6.8 used until 1968 for GO passengers
until GO commuter station completed at mileage 6.7
GTR/CNR stn written up in local Etobicoke Guardian (Nov 2002) where
sudden interest to save and designate but stn structurally beyond saving
(stn has personal sentiment - my uncle once was here and he often
complained that all he had to write train orders by was a 15 watt
bulb) |
Mount Pleasant |
Kitchener / Georgetown (CNR Weston) |
Train & Bus
|
45/7 |
- |
Mount Pleasant |
- |
Mount Joy |
Stouffville (CNR Uxbridge) |
Train & Bus
|
45/7 |
- |
Mount Joy |
constructed 2002, offical opening 02 Dec 2002 - will not change
current timetable schedule |
Back to top |
N |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Newmarket |
Bradford (CNR Newmarket) |
Train & Bus
|
34.2 |
42106 |
Newmarket |
- |
Niagara |
Niagara - Lakeshore West (CNR Grimsby) |
Train & Bus
|
0.6 |
48190 |
Niagara Falls |
- |
Back to top |
O |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Oakville |
Lakeshore (CNR Oakville) |
Train & Bus
|
21.4 |
(219) 43640 |
Oakville |
Dec 1966 stn constructed
platform rehabilitation Summer 2002 |
Old Cummer |
Richmond Hill (CNR Bala) |
Train
|
14.1 |
- |
Old Cummer |
constructed Oct 1977, finished May 1978 |
Oriole |
Richmond Hill (CNR Bala) |
Train
|
12.2 |
42572 |
Oriole |
constructed Oct 1977, finished May 1978 |
Oshawa North |
Lakeshore (GO Sub) |
Train & Bus
|
11.6 |
(41783) |
Oshawa |
- |
Back to top |
P |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Pickering South |
Lakeshore (CNR Kingston) |
Train & Bus
|
312.9 |
(41791) |
Pickering |
Dec 1966 stn constructed
improvements 1987-8 |
Pickering North |
Lakeshore (GO Sub) |
Train & Bus
|
1.0 |
- |
- |
Dec 04 1988 opened |
Port Credit |
Lakeshore (CNR Oakville) |
Train & Bus
|
12.8 |
(150) 43610 |
Port Credit |
Dec 1966 stn constructed
Dec 1977 pedestrian underpass & passenger canopies for north
platform
platform rehabilitation Summer 2002 |
Back to top |
Q-R |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Richmond Hill |
Richmond Hill (CNR Bala) |
Train & Bus
|
21.0 |
(42592) |
Richmond Hill |
constructed Oct 1977, finsihed May 1978 |
Rockwood |
Kitchener / Georgetown (CNR Guelph Sub / Note: now GEXR Guelph Sub) |
Train & Bus |
41.2 |
46164 |
Rockwood Station ca1956 |
1st station build by GTR 1856, destroyed by fire in 1905
2nd station single storey wood built by GTR in 1912 closed ca 1970 and sold to Ontario Electric Railway Historical Assn then in July 1971 it moved 2 miles south to museum site.
started 26 Oct 1991 Trains 145/6
ended 03 Jul 1993 account gov't cutback returns to 1990 route out of
Georgetown
as of 2019 Rockwood still no station stop |
Rouge Hill |
Lakeshore (CNR Kingston) |
Train & Bus
|
317.3 |
- |
Rouge Hill |
Click here to open separate window on Rouge Hill |
Rutherford |
Bradford (CNR Newmarket) |
Train & Bus |
15.5 |
- |
Rutherford |
- |
Back to top |
S |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
St. Catharines |
Niagara - Lakeshore West (CNR Grimsby) |
Train & Bus
|
48152 |
11.8 |
St. Catharines |
- |
Scarborough |
Jct with Lakeshore (CNR Kingston) & Stouffville (Uxbrdige Sub) |
Train |
325.2 Kingston 61.0 Uxbridge |
(260) 41798 |
Scarborough |
See my Scarborough Junction slideshow 1977 and other historical notes
Dec 1966 stn constructed
no under-/overpass passengers had to use grade crossing protection
1977 pedestrian underpass & passenger canopies for north
platform |
Stouffville |
Stouffville (CNR Uxbridge) |
Train & Bus
|
40.6 |
41826 |
Stouffville |
- |
Streetsville |
Milton (CPR Galt) |
Train & Bus
|
20.3 |
3216 |
Streetsville |
constructed 1980, finished 1981
offically opened 25 Oct 1981
platform rehabilitation Summer 2002 |
Back to top |
T-U |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
Union |
Toronto Terminals Railway |
Train & Bus |
338.0 Kingston 0.0 Galt 0.0 Oakville 0.0 Bala 0.0
Weston |
3185 CPR 42414 CNR |
Union Station / GO Corridors Index |
See my Flyunder Webpage here |
Unionville |
Stouffville (CNR Uxbridge) |
Train & Bus
|
50.7 |
(41816) |
Unionville |
- |
Back to top |
V-W-X-Y-Z |
STATION |
CORRIDOR / (RAILWAY SUBDIVISION) |
STATION STATUS / ACCESSIBILITY |
SUBDIVISION MILEAGE |
STATION NUMBER (CNR/CPR) |
PHOTO(S) |
NOTES (Non-comprehensive) |
West Harbour |
Niagara - Lakeshore West (CNR Grimsby) |
Train & Bus
|
43.7 |
|
- |
- |
Weston |
Kitchener / Georgetown (CNR Weston, Halton) |
Train
|
8.6 |
42220 |
Weston |
- |
Whitby North |
Lakeshore (GO Sub) |
Train & Bus |
8.9 |
- |
Whitby |
Victorian style - construction Sep 1987-8 - opened Dec 04 1988
rehabilitation to station building to begin 17 Dec 2001 with scheduled
completion 31 Mar 2002 |
York University |
Bradford (CNR Newmarket) |
Train
|
12.6 |
- |
York University |
to open September 2002
to use new TVMs |