 | |  |
 |  |  |
 |  |  |
 |  |  |
 |  |  |
 Grizzly Gulch Truss #6 2/5/09 |  Grizzly Gulch Truss #5 2/5/09 |  Grizzly Gulch Truss #4 2/5/09 |
 Grizzly Gulch Truss #3 2/5/09 |  Grizzly Gulch Truss #2 2/5/09 |  Grizzly Gulch Truss #1 2/5/09 |
 Grizzly Gulch expansion #4 2/4/09 |  Grizzly Gulch expansion #3 2/7/09 |  Grizzly Gulch expansion #2 2/4/09 |
 Grizzly Gulch expansion #1 2/4/09 |  Grizzly Gulch Truss #1 2/4/09 |  Grizzly Gulch Truss #2 2/4/09 |
 Grizzly Gulch Bridge #1 2/3/09 |  Grizzly Gulch Bridge #2 2/3/09 |  Grizzly Gulch Bridge #3 2/3/09 |
 Grain Elevator #1 |  Grain Elevator #2 |  Interlocking Tower |
 SOO U30C passing on the mainline |  SOO SD60 refueling |  SOO U30C at the Water Tower Curve |
 Roundhouse weathering #1 |  Roundhouse weathering #2 |  Interlocking tower corner #1 |
 Interlocking tower corner #2 |  SOO U30C |  Rock Island SD402 passing switcher |
 Mt. Dew #1 |  Mt. Dew #2 |  Brown & Haley Distributing |
 freight Distributing |  Grain Mill |  Staged to run |
 First Freight |  New Track #1 |  New Track #2 |
 New Track #3 |  Mt Dew Backdrop |  Mt Dew Backdrop primered |
 SD60 shell and frame |  Inside cab |  Shell removed |
 Holes drilled in roof |  Beacon installed |  Lights working |
 SOO 4413 GP38-2 |  Chip, LED, Resistor |  LED and Resistor connected |
 Trestle #1 |  Trestle #2 |  Trestle #3 |
 Consist #1 |  Consist #2 |  SOO Motive Power |
 From the tracks |  Without Flash |  With Flash |
 SOO GP38-2 & SD60 #1 |  SOO GP38-2 & SD60 #1 |  SOO GP38-2 & SD60 #1 |
 Painting #1 |  Painting #2 |  Painting #3 |
 Painting #4 |  Painting #5 |  Painting #6 |
 Old Grizzly Trestle #1 |  Old Grizzly Trestle #2 |  Old Grizzly Trestle #3 |
 Old Grizzly Trestle #4 |  Old Grizzly Trestle #5 |  Old Grizzly Trestle #6 |
 Old Grizzly Trestle #7 |  Old Grizzly Trestle #8 |  Old Grizzly Trestle #9 |
 Corner of Freight Yard leg |  Freight Yard |  Grizzly Gulch Crossing #1 |
 Grizzly Gulch Crossing #2 |  Grizzly Gulch Crossing #3 |  Grizzly Gulch crossing #4 |
 Fueling Facility #1 |  Fueling Facility #2 |  Fueling Facility #3 |
 Addition of ground cover #1 |  Addition of ground cover #2 |  Industrial corner |
 Grizzly Gulch Leadin |  Frame of work area walls #1 |  Frame of work are walls #2 |
 Layout Walls #1 |  Layout Walls #2 |  Layout Walls #3 |
 Brown & Haley Distribution #1 |  Brown & Haley Distribution #2 |  Brown & Haley Distribution #3 |
 Testing Castrol Super Clean |  After a soak |  Paint removed |
 Entrance to engine facility |  Engine facility office |  Freight Yard leg #1 |
 Freight Yard Leg # 2 |  Down to Mt Dew |  Roundhouse and Turntable |
 Rock Island RS-1 |  Tacoma Rail #1 |  Tacoma Rail #2 |
 Tacoma Rail #3 |  Tacoma Rail #4 |  Tacoma Rail #5 |
 Tacoma Rail #4001 |  Tacoma Rail #4001 & 4002 |  Tacoma Rail #4002 |
 Freight Yard Leg |  Freight Yard & Service Road |  Freight Yard Power Gaps |
 Service Road # 1 |  Service Road # 2 |  Service Road # 3 |
 Interlocking Tower Retaining Wall # 7 |  Interlocking Tower
Retaining Wall # 8 |  Interlocking Tower Retaining Wall # 9 |
 Interlocking Tower Retaining Wall # 4 |  Interlocking Tower Retaining Wall # 5 |  Interlocking Tower Retaining Wall # 6 |
 Freight Yard Retaining Wall # 1 |  Freight Yard Retaining Wall # 2 |  Freight Yard Retaining Wall # 3 |
 Interlocking Tower Retaining Wall # 1 |  Interlocking Tower Retaining Wall # 2 |  Mainline Ballast |

Mt. Dew Curve Ballast # 1 |  Mt Dew Ballast # 2 |  Mt Dew Ballast # 3 |
 Mt Dew Ballast # 4 |  Freight Yard Retaining Wall |  Staging Yard Controls |

Mt. Dew Frame |  Mt. Dew Shell |  Mt. Dew Rocks |
 Freight Yard Leg #1 |  Freight Yard Leg # 2 |  Roundhouse |
 Strawberry Mountain Shell |  Strawberry Mountain Base |  Strawberry Mountain Rocks |
 Town Lower Curve #1 |  Town Lower Curve #3 |  Solder Joint #1 |
 Solder Joint #2 |  Painted Track #1 |  Painted Track #2 |