Maynard has devised a structure to support the 223 boiler when we eventually have it lifted off the frame and set to the side. We need several ties to build a base structure then two 16 foot long rails for support. Saturday the 12th we hauled the rail from the south end of the yard to the restoration shop area. Here is a short video of that project.