While building the T&SF has been, and cotinues to be, a labor of love, putting the railroad through its paces is even more enjoyable. The railroad operates on a loose (but defined) schedule using car cards and waybills. Each train has its purpose, and cars have their loads and destinations.
Several documents explain in greater detail the operating proceedures of the T&SF. One of these documents is the T&SF General Operating Information