TrainWeb.org Facebook Page
Update 10/15/16 | 223 project

223 update 10/15/16
01.jpg

Bent drive rod

02.jpg

Rod straightened by Bonneville Machine

P1200085.jpg

Removing the ash pan and transferring to the back room of the shop

P1200089.jpg

P1200089.jpg

P1200090.jpg

P1200090.jpg

P1200091.jpg

Running gear sans ash pan

P1210411.jpg

Brake assemblies were removed

P1210414.jpg

Rods and other parts stacked to the side of the shop behind the tender.

P1210419.jpg

John Barret removes the two frame gauge bars.