27 August 2016


27 Aug 2016    Crew: Gary, Glenn, Kent, Gerry and Barry

Gorge
Glenn and Gary added some more rock castings to the canyon. A lot of progress lately from contributions from almost everyone. Gerry started adding riverbottom to the Arkansas running through the gorge.

  

    

Cleora
Tom has been building the dual gauge curved switches on the west end of the Cleora stockyard. A #10 on the mainline into the yard with a #8 curved switch under construction.

  

Salida
Barry replaced tri-colors LEDs in the main Transfer Yard switch panel. Kent completed installing the toggles for the car shops, the narrow gauge scales and yard ladder. Gary patched the previous Digitrax UPS access panel and started the relocation of terminal strips (to accommodate the moving of the Salida PM4 panel to the base of the fascia).

  

Gray's Siding
Gerry is reworking the streambed from Gray's Creek, which had turned all milky. Gerry ripped at all the bad water and is adding all new "water".

  

Marshall Pass
All is quiet currently at Marshall Pass.

Shawanno
Gerry worked the water anomaly at the bottom of the trestle. Terry recently completed a lot of scenery.

   

   

Parlin
Glenn re-ballasted the line behind Benny Hill with Gerry.

   


28 May 2016    Crew: Gary, Glenn and Barry

Salida
Gary and Glenn worked on the Salida switch panel for the West Salida yard. We sanded the end to fit the curve at the Arkansas Bridge and corrected the template.

Crested Butte
Barry worked on the wye.

General

  • After checking the traps, three fatalities reported. See the tally in the Injury Report.


    25 May 2016    Crew: Gary, Kent and Barry

    Salida
    Gary cut the door jam board for the West Salida panel.

    Shawano
    Gary worked on the switch panel.

    Crested Butte
    Barry and Kent worked on the wye.


    18 May 2016    Crew: Kent, Gary, Dan and Barry

    Cleora
    Kent repaired the short on the switch from the 1st & 2nd Mains.

    Shawano
    Gary worked on the switch panel.

    Parlin
    Kent cleaned the Foreign Object debris from the west Parlin D&RGW track to main switch.

    Crested Butte
    Barry with inspiration from his disabled sidekick trackman Dan, repaired the Wye switch at Crested Butte as well as a second switch near the station.


    14 May 2016    Crew: Gary, Glenn, Kent and Barry

    Operations Session

  • Not as many trains running this month but managed to keep everyone busy with special assignments.
  • See the Operations Report.


    11 May 2016    Crew: Kent, Gary, Glenn and Barry

    Marshall Pass
    Kent installed a 3rd light in the Marshall Pass snowshed over the west switch.

    Parlin
    Glenn started painting the striata on the fascia side of Benny Hill.

    Operations
    Gary worked on some car cards for Tarry's and Tom's new cars and cleaned up Cleora.


    7 May 2016    Crew: Kent, Gary, Glenn, Gerry and Barry
    Visitors: Kent Hoilman

    Marshall Pass
    Kent made an overhead lamp mounted in the snowshed near the switch on the west end. It works by contact tabs under the structure, so is totally removable with the snowshed.
      

    Shawano
    Gary built a cutout for the new horizontal switch panel. It will allow the switch table with track schematic, toggles and LEDs to be removable for repair and scenery to be built up next to the panel. There is now some space on the opposite side of the track for a tool shed and out buildings.

    Parlin
    Glenn continued work on Benny Hill, with some help from Gerry. They added hydrocal on the cutaway face (above the fascia) and carved striata along the surface.

    Standard Gauge Staging
    Barry began relocating the switch toggle panels to accessible points on the reverse loop end of staging.

    General

  • Kent Hoilman returned for a visit and caught up with goings-on.
  • Hal is recuperating from 21 radiation treatments which has left him pretty much wiped up. Get well Hal!

  • 4 May 2016    Crew: Kent, Gary, Glenn, Dan and Barry

    Cleora
    Gary added some cardboard netting to fill the holes in the scenery around the stockpens next to the Arkansas River and the area between the trestle over the dry streambed near Red Hill.

    Marshall Pass
    Kent built a working light on the turntable by adding a LED to the lamp and rebuilt the conduit to have one wire thread through.

      
      
      
    Parlin
    Glenn began planning further refinement to Benny Hill, gathering hydrocal and rock materials.


    30 April 2016    Crew: Kent, Gary, Glenn, Gerry and Barry

    Cleora
    Gary built framework to house the removable west end switch panel, along with some additional drywall cardboard shims used for terrain webbing.
      

    Shawano
    Tarry has been working on the cut at Shawanno and the scenery for the RR buildings along the track.
      

    Parlin
    Glenn added foilage and soils to Benny Hill.
      


    Crested Butte
    Gerry has been blending the foreground hill with the backdrop.
      


    20 April 2016    Crew: Kent, Gary, Tom, and Barry

    Cleora
    Tom had Gary and Kent relay a portion of the roadbed we screwed up. After carefully prying up the west end piece after it fortunately been glued down very badly - luckily. It came up fairly easily and we were able to reattach the piece along the proper alignment and all were happy.


    16 April 2016    Crew: Kent, Gary, Glenn, and Barry

    Cleora
    Kent and Gary attached the luann roadbed sections for the Cleora stockpens.
      



    13 April 2016    Crew: Kent, Gary, Glenn, Tom and Barry

    Cleora
    Tom and Gary cut out the luann roadbed for the Cleora stockpens.
      


    9 Apr 2016    Crew: Gary, Glenn, Kent, Tarry and Barry

    Operations Session
    No work. See the Operations Report.


    2 Apr 2016    Crew: Tarry, Kent, Gary, Glenn and Barry

    Shawano
    Tarry worked on the scenery and got the foundation laid for the the bunk house and coal house. He also worked on the top of the cut to give it more slope.

    Pitkin Branch
    Gary found a couple tight spots with the NMRA gauge on the new track, and made adjustments to the ties at the defected spots and reglued the track down with CA. Track feeders still will be required for completion.

    Parlin
    Glenn worked on Benny Hill and gave him an amazing makeover outside on the driveway, with a nice layering and scalp job. The wet plaster face cover did wonders and the hill looks great.

    Staging Lighting
    Kent and Barry worked on installing the new LED lighting underneath the narrow gauge staging, for night lighting the aisleways.


    29 Mar 2016    Crew: Tarry, Kent, Gerry and Barry

    Shawano
    Tarry worked on the foundation laid for the the section house and added a dry wash.

    Pitkin Branch
    The damaged section of track connecting Parlin to the Alpine Tunnel, Nathrop, and Buena Vista via the C&S (former South Park and Pacific) has been repaired. K-27 #1456 ran restored section in both directions. Clearance past Harrison Cliff is tight but will be OK so long as crew does not lean outward. Track glued with Pliobond.

    Staging Lighting
    Kent and Barry worked on installing the new LED lighting on the standard gauge staging.


    24 Mar 2016    Crew: Tarry, Kent, Gerry and Barry

    Pitkin Branch
    Gerry spliced two code 70 track pieces together. New track is held with just rail joiners pending trial run with locomotive and train to ensure clearance along Harrison’s Cliff. If all appears satisfactory track can be glued and spiked Wednesday evening.

    Shawano
    Tarry added some "geology" to the geographicaly challenged area along the track, and incorporated some ground cover as well.

    Layout Lighting
    Kent and Barry worked on the next application of LED lighting on the staging deck.

    HO Staging North side with new LED lighting.


    19 Mar 2016    Chow: Gary,Gerry and Barry
    19 Mar 2016    Crew: Gary and Barry

    Pitkin Branch
    Gary cut out and replaced a short piece of cork roadbed and cut a piece of Micro-Engineering flextrack to replace the old damaged rails. Joiners were added on the rails to adjust the rail height to the current shinohara rails, which are on slightly thicker ties. The new flextrack will be spiked at the ends on the wooden ties and caulked down in between.

    Layout Lighting
    Barry on the LED lighting for staging deck replacement of the incandescent lights and the NG staging (underneath lighting).

    General

  • Barry brought detailed sketches, required mateerials and cost estimate for the proposed club annex addition.


    16 Mar 2016    Crew: Gary, Tom, Gerry and Barry

    Cleora
    Tom and Gary worked on a cardstock template for the track plan and laid out the tracks. Looks like a #6 DG wye will be required on the east ladder sidings. Tom added more subroadbed pine and sanded the boards smooth. Tom made the template for the west ladder and took it to cutout on a new piece of luann. Gary needs to make a good wye template before we can accurately lay out the east ladder.

    Poncha Junction
    Barry completed the LED installation from Poncha Jct to Tennessee Pass and started planning lighting for staging deck replacement of the incandescent lights and the NG staging (underneath lighting).

    Tank 7
    Gerry and Barry completed the track repairs to the mainline. Gerry completed spiking and gapping the rails and Barry added new feeders.   

    Narrow Gauge Roster

  • The first completed Class 2 short caboose has finally made its inaugural apperance on the layout. Tom brought out his spankin' new Carmengo & Funaro D&RGW Chort Caboose #0577. Tom used some Precision Scale end parts for the ladders. Check out the Narrow Gauge Short Caboose (Class 2) roster. This is the second caboose (#0517 Round Roof) that Tom has built and completed in as many weeks.


    12 Mar 2016    Crew: Gary, Glenn, Kent, Gerry and Barry

    Operations Session
    No work. See the Operations Report.


    09 Mar 2016    Crew: Gary, Glenn, Gerry & Tom

    Cleora
    Tom and Gary worked on the basic track layout at Cleora, and cut out some luann roadbed pieces. We put the roadbed centerline 1 1/4" offset from the fascia and 2" from the mainline. The plan is to lower the subroadbed slightly so the sidings will be below the mainlines. Tom installed the subbase (which will also be the subroadbed) to support the curved switches coming off the mainline from the end towards Barrel. We may be forced to place the standard gauge tank on the switch to the stockyards, off of the mainline due to space limitations.

    Tank 7
    Gerry repaired the rails that "popped off" the trestles at Tank 7, by spiking the rails onto the bridges. Lack of gaps in the rail through the curve apparently caused the rails to pop off of the CA cementing the rails to the trestles, due to thermal expansion.

    Parlin
    Glenn worked some more on the foam hill, adding more terrain features. The hill is easily removable providing total access to the track. Glenn added ravines and gouges to the hill, to make it more realistic before applying plaster cloth.


    05 Mar 2016    Crew: Gary, Glenn & Barry

    Poncha Junction
    Barry worked on the lighting above the Depot and Section House.

    Speaking of the Depot, Hal says he is working on finishing up the roof, while recovering from some recent surgery. Unfortunately, Hal got an infection from the stitches and is slowly fighting that off, and has been unable to attend meetings. However, he is still keeping busy and anxious to see what other kits Ed Dorroh has given us. He also would like to remind Barry that he has some projects still awaiting him, including a sink installation. -I guess that means about everything!

    Parlin
    Glenn finished building the big hill between Parlin and Gunnison out of several pieces of 2" sheet foam.

    General
    Gary updated the narrow gauge inventory of rolling stock currently on the layout and will update the NG rosters accordingly.

  • 25 30' and 3 34' Stock Cars
  • 35 High Side Gondolas- we probably need about 50 total.
  • 14 30' Box Cars
  • 6 D&RGW Reefers, 2 C&S Reefers (but both different liveries of the same car!)
  • 10 Flat Cars (2 with permanently attached loads). Loads are simply set on the rest loose for delivery & removal.
  • 2 Drop Bottom Gondolas
  • 1 MOW Car (Wheel & Tie) - Red Livery
  • 1 Passenger Coach
  • 7 Round Roof Long Caboose (there were only 5, two are identical and two different livery)


    20 Feb 2016    Chow: Kent, Gary, Glenn, Grant & Barry
    20 Feb 2016    Crew: Kent, Gary, & Glenn

    Operations Session
    No work. See the Operations Report.


    17 Feb 2016    Chow: Kent, Gary, Glenn, Dan & Barry

    General
    Track cleaning / clean-up / Layout clean-up in prparation for Saturday's delayed ops session.



    2015 Status Reports2012 Status Reports2009 Status Reports
    2014 Status Reports2011 Status Reports2008 Status Reports
    2013 Status Reports2010 Status Reports2007 Status Reports







    Return to Scenic Line Modeler's Home           This page last modified 27 August 2016.