28 Dec 2013 Chow: Jake, Gary, Alex, Hal & Gerry
Monarch
Grays
Marshall Pass
Tank No. 7
Parlin
Cimarron
General
Gerry installed a vice on the mobile work bench.
21 Dec 2013 Chow: Tarry, Gary, Alex, Hal & Gerry
Monarch
Parlin
Hal drew a plan view of the stock pens.
Cimarron
7 Dec 2013 Crew: Barry & Gerry
Tank No. 7
General
30 Nov 2013 Crew: Gary
Cimarron
23 Nov 2013 Crew: Gerry, Barry, Tarry, Jake & Hal
Grays
Marshall Pass
Tank No. 7
Parlin
Cimarron
20 Nov 2013 Crew: Gerry, Gary, & Hal
General
16 Nov 2013 Chow: Jake, Gary, & Barry
Cimarron
Grays
Shawano
Tank No. 7
Parlin
General
Tank No. 7
General
Barry looked for track and switch problems and the ran narrow gauge trains.
Gerry & Hal later ran narrow gauge trains.
Salida
Tank No. 7
Hal checked the dimensions for each of the three trestles to be installed at Tank NO. 7.
Cimarron
General
Poncha Junction
Grays
Shawano
Tank No. 7
Poncha Junction
Marshall Pass
Tank No. 7
Cimarron
Hal glued the stock pens to the removable plastic base and checked the clearences.
Poncha Junction
Grays
Marshall Pass
Shawano
Cimarron, Montrose, and Baldwin
Hal measured and cut the 1/8" thick Styrene sheet to be used as a base for the
removeable stock pens to be placed on the duck-under.
General
Marshall Pass
Cimarron
Marshall Pass
Cimarron
Cimarron
Grays
Marshall Pass
Shawano
Shawano
Marshall Pass
Cimarron
Shawano
Cimarron
Marshall Pass
Shawano
Cimarron
Salida
Grays
Shawanno
Shawanno
Shawano
Cimarron
Barry continued the installation of the 12 volt busses. One for the12 volt track power and one for the 3 volt switch motors.
Hal finished the measurements required for the placement of the stock pen. A K-27 Blackstone engine, NO 464 with a snow plow,
was used for the clearance check. A dimension of 6.0 feet from the centerline of the track to the loading dock will be required.
Pitkin
Barry installed a buss for the track power.
Marshall Pass
Shawano
General
Shawano
Cimarron
Hal made the measurements for the placement of the stock pen.
Gary placed code 70 narrow gauge rail at the stock pen location at Cimarron.
Parkdale
Grays
Marshall Pass
General
Visitor: Gary Riffle stopped by the club. Good to see him again.
Montrose and Baldwin
Cimarron
Pitkin
Marshall Pass
Visitor: Gary Riffle stopped by the club. Good to see him again.
Pitkin Branch
Wednesday, April 24, 2013
Beautiful night,full moon, light outside all the way to 8PM sunset.
Pitkin Branch
Switch Panels
Narrow Gauge Staging Deck
Saturday, April 20, 2013.
Gary and Hal met at the Village Inn for breakfast at 8:00 am.
Work Sessions at the the club house.
Pitkin Branch
Mears Junction
Cimmarron
Alex worked on the scenery for the Monarch Mine.
Gerry worked on the scenery.
Jake worked on the scenery.
Gerry installed the last bent for the wooden pile trestle NO. 3.
Hal constructed a cardboard mock-up of the stock pens.
Gary painted the ties, swiches, and track.
Barry continued to install the lighting system under the layout.
21 Dec 2013 Crew: Tarry, Gary, Alex, Hal, Barry & Andrew
Alex and Andrew worked on the scenery for the Monarch Mine.
Tarry worked on the scenery.
Gary installed narrow gauge track from Gunnison to Cimarron on the duck-under.
Gerry installed the decks of each of the three wooden trestles over Marshall Creek. The bents will be installed at later date.
Barry installed sheets of foam insulation on the garage doors of the club house.
Gary worked on the track.
Jake worked on the scenery.
Gerry worked on the scenery.
Hal worked on the placement of the three wooden trestles.
Tarry continued to work on the placement of structures and the scenery.
Barry continued to install switch motors.
Gerry: Photo shoot of Marshall Pass on the layout.
Guests: Pete Doty, Harry Lindsay, and Jim
Gary repaired the track on the duck-under.
13 Nov 2013 Crew: Gerry, Jake, Tarry, Gary, & Barry
Jake worked on the scenery.
Barry wired the track.
Gerry finished the sub-roadbed for the three trestles.
Tarry worked on the placement of structures.
Gary cleaned track.
9 Nov 2013 Crew: Gerry, Hal, Gary, & Barry
Gerry worked on the three trestles at Tank NO. 7 determining the dimensions for the required bents with Hal.
Gary cleaned track and ran narrow gauge trains.
2 Nov 2013 Crew: Gerry, Jake, Gary, & Hal
Hal cleaned the track at Salida and then tested the track and switches by running narrow gauge engine K-27 NO. 464.
Gerry cut the sub-roadbed for trestles NO. 1 and NO. 3. Installed risers at the trestle locations.
Hal presented the paint scheme for the stock pens.
Much house cleaning.
30 Oct 2013 Crew: Gerry, Jake, Gary, & Barry
Barry worked on the switch panels.
Jake placed static grass on the scenery.
Gary installed terminal strip to bus.
Gerry cut the sub-roadbed for trestle NO. 2.
26 Oct 2013 Crew: Gerry, Gary, Hal & Barry
Barry worked on the LEDs.
Gerry worked on the scenery.
It has been decided to place three panel wooden pile trestles to span Marshall Creek, each at a different location
at Tank NO. 7. Two of the trestles will be 48 feet and one at 42 feet in length. Hal will scratch build the trestles.
Gary installed trackage.
23 Oct 2013 Crew: Barry
Barry worked on the LEDs.
19 Oct 2013 Crew: Barry, Gary, Jake, Hal & Gerry
Jake continued to work on the scenery.
Gerry worked on the scenery.
Gary connected the track to the trestle.
Barry continued to work on the placement of switch motors.
A motion was made to include the following items.
1. The first Saturday of each month: Clean the club house and trackage on the layout to be tested by running some trains.
2. The following Wednesday will be for assembling trains to be run and/or an operating session.
3. The following Saturday will be dedicated to running trains and/or an operating session.
The motion passed.
16 Oct 2013 Crew: Barry & Gerry
Gerry worked on the scenery.
Barry continued to work on the switch motor control.
12 Oct 2013 Crew: Barry & Hal
Hal placed plaster cloth for the scenery.
Barry continued to work on the switch motor control.
09 Oct 2013 Crew: Barry
Barry continued to work on the switch motor control.
28 Sep 2013 Crew: Jake, Gerry, Gary & Hal
Jake and Gerry worked on the scenery.
Gary & Hal worked on the switch panel. Hal placed plaster cloth for the scenery.
Gary worked on the placement of the track required for the installation of the trestle.
25 Sep 2013 Crew: Gary, Hal & Barry
Gary continued working on the trackage required for the placement of the trestle. Gerry continued working on the placement of the trestle.
21 Sep 2013 Chow: Gary, Hal & Barry
21 Sep 2013 Crew: Gary, Hal, Jake & Barry
Jake worked on the scenery.
Barry continued to work on the switch motor control.
18 Sep 2013 Crew: Gary & Barry
Gary Worked on the placement of road bed, ties, and rail required for the installation of the trestle.
Barry continued to work on the switch motor control.
14 Sep 2013 Crew: Gary, Barry, & Hal
Hal worked on the placement of scenery required for Marshall Pass.
Gary worked on the placement of the track required for the trestle.
Barry continued working on the switch motor control.
11 Sep 2013 Crew: Gerry, Gary, Barry, Jake
Gary constructed and placed the platform for the scale house.
Jake worked on the scenery.
Gerry worked on the scenery required for the placement of the trestle.
Barry worked on the switch motor control.
7 Sep 2013 Crew: Barry, Gerry, & Hal
Gerry Worked on the scenery required for the placement of trestle and water tank.
4 Sep 2013 Crew: Gary, Gerry, & Jacob
Gerry and Jacob Worked on the structural supports required for the scenery.
Gerry placed plaster cloth for the scenery.
Gary worked on some switch panels and the placement of track.
31 Aug 2013 Crew: Gary, Gerry, Barry, & Hal
Gerry placed the supports required for the scenery.
Barry installed the buss needed to run the 3 volt switch motors.
Gary worked on the switch panels.
Hal placed a second layer of plaster cloth for the scenery.
Hal placed a second layer of plaster cloth for the scenery.
24 Aug 2013 Crew: Gary, Gerry, Barry, Hal,
Shawano
Gerry Glancy: Made and placed the risers required for the trestle.
Barry Best: Connected the track leads at to the buss wire. Checked out one 12 volt motor that was
selected from the 45 motors that were purchased by Gary Myers for $2.00 a piece. The motor passed the test
and will be used as a switch motor. Continued to work on track and switch electrical problems.
Gary Myers: Placed code 70 narrow gauge rail on the mainline from Gunnison to which is located on the duck under.
Gary Myers: Connected the track.
Hal Zimbelman: Worked on the scenery. Will need risers to be placed in order to support the additional scenery.
Gerry Glancy will make the risers.
17 Aug 2013 Chow
17 Aug 2013 Crew: Gary, Gerry
Wednesday night I worked on lettering Cleora, Red Hill, Parkdale, Parlin, Shawano, Portland, Gorge and Hel Junction.
27 Apr 2013 Crew: Gary, Hal & Jacob
More photos "Under Construction".
23 Apr 2013 Crew: Gary, Hal & Jacob
Gary removed the panels under the track for the extension into the Dispatcher area, then made a cross brace and cut a new
riser to replace the current one. This will be installed on Saturday. Unfortunately, this will require removal of the
current riser to track from Grays to Marshall Passin order to install the new one which will be closer to Grays and next
to Sheds. The current one has to move "dowgrade", to accomodate the extension of the Pitkin Branch track which will wrap
through the backdrop, under the Marshall Pass track and dead end in the Dispatcher space for staging the C&S/Pitkin Branch
train.
Applied another coat of polyurathane to the West Salida, Parlin, Poncha Junction and Marshall Pass panels.
Continued spiking rail on 4th staging track (Baldwin Branch) along back wall. Other 3 tracks for Montrose staging are
completed.
Gary and Hal modified the backdrop at Tank NO.7 in order to accomdate the increase in the length of the
spur track for the C&S engine and cars which will be parked at Tank NO. 7. The next step is to build the
road bed and supporting risers required to obtain a grade between 1 and 2%. This work must be completed
before any additional scenery and structures can be placed at the Tank NO. 7 site.
Jake worked on the scenery required at Mears Junction. Jake will also be trying for the first time to assemble
hand laid switches.
Hal will assemble a cardboard mockup of the stock pens to be placed at Cimarron, Colorado. A decision was
made to make the stock pens removeable since they are to be placed on the moveable duck under.