| Location | Cost in 1914 | Building or item to Reproduction |
| Lakeland | $1,775.00 | | Wholly maintained, Auth to retire derails at inter 4-1-1940 |
| Chilson | to retire elevator track ICC# 88 566' 1-30-1935; 357' of ICC# 85, 250 ' of ICC# 84; |
| ICC# 78 865' 12-31-1937;retire 2640' of wye track ICC# 80, 826' of wye track ICC# |
| 81 1-25-1940 |
| Chilson | $0.00 | | Water Tank Pump House |
| Chilson | $350.00 | | Agent house |
| Chilson | $150.00 | | 1 car and 2 bunk cars, Auth to retire 1 car body used as section house 3-2-1932; |
| Auth to retire box car dwelling 2/11/1936;Retire 2 boxcar bodies 4-1-1940 |
| Chilson | $850.00 | | Freight and Passenger station, Auth to retire 1-25-1940 |
| Chilton | $365.00 | | 16' x 24' Tank - steel support, drop spout |
| Annpere | $1,790.00 | | Freight and Passenger - Pere Marquette ½ |
| Annpere | $3,300.00 | | Pere Marquette 1/2, auth to retire derails 2-13-1941 |
| Howell | to retire watchman house, crossing signs - flashing lights signals installed 1-25- |
| 1940 |
| Howell | $1,876.00 | | Freight House, Auth to retire 8' x 48' extention to platform 2-11-1936 |
| Howell | $3,000.00 | | Passenger station |
| Howell | to retire crossover track ICC# 1804 206' 1-25-1940 |
| Howell | $660.00 | | Motor Car House |
| Howell | $1,750.00 | | Coal dock, William, White, 10 pockets |
| Howell | $72.00 | | Tool House, Auth to retire 1-30-1935 |
| Howell | $675.00 | | Stock yards and scale |
| Oak Grove | $2,300.00 | | Passenger and Freight Station |
| Oak Grove | $400.00 | | Stock yards, Auth to retire 12-31-1937 |
| Oak Grove | $100.00 | | Tool House cars (2), auth to retire 12-31-1937 |
| Cohoctah | $1,050.00 | | Passenger and Freight Station |
| Cohoctah | to retire 500' of ICC# 107 12-31-1937 |
| Cohoctah | $50.00 | | Tool House - car |
| Cohoctah | to retire stock pens 12-31-1937 |
| Byron | $50.00 | | Bunk car, Auth to retire 1-30-1935 |
| Byron | $120.00 | | Tool House |
| Byron | $3,603.00 | | 15' x 24' Tank, wooden support, 1 - 8" stand pipe, 1 drop spout |
| Byron | $2,020.00 | | Passenger and Freight Station |
| Byron | $650.00 | | Stock yards, Auth to retire 1-25-1940 |
| Sunday, July 23, 2017 | Page 4 of 14 |