Five bridges and two trestles should add a little
operational interest.
The sections will have the centers filled with construction foam sheeting and
will use plywood sub-roadbed on risers. That will allow us to vary the terrain
so it won't be all flat. We can carve out sections for rivers and gully's. On
one section, the height between the top of the bridge (on the second level) and
the river bottom will be just over a foot. We also plan to present as many types
of bridges and trestles as we can, from a wooden bridge to a modified MTH
bridge. On the lower level, the outer main lines on the sides, will become the
inner tracks on the ends, crossing under the upper-level tracks. That should
also add operating interest.
(You are here: SJSG Home -> Layouts -> New Layout
Index -> Picture07)