TrainWeb.org Facebook Page
T-Yard setup tracks - SHR N-TRAK

Back view of SHR N-TRAK's yard module set

The setup tracks of the club's T yard. Dual 12 foot long tracks permit operators to assemble or put away 24 foot long trains with briefer interruption of the operation of trains in the public view. The rotary switches on the vertical main control panel route main line throttle or yard throttle power to the setup tracks.
Photo by Robert Cruse.
Added May 27, 2003