As of Jan 6, 1996 when authorization for construction was granted, this is what the future site of the GIRR looked like. All the trees came out and the roots were rather laboriously dug out.
This area had been essentially abandoned as the chief engineer didn't even recognize that the two trees in the background were even there until planning had started.