Upper Level
The upper level design has been aproved by the Layout and Track Committees, and generaly follows this plan. Construction has begone since the lower level is completed to a point where the overhead construction doesn't hinder further construction on the lower level. 90% of the framwork is in place, next step includes the sub-roadbed.
Click on map to open in a larger window

Scenery on the upper level is expected to be mountainous. It will be
primarily single track with sidings for meets. There will be at least one
branch line, and a few industries that will require switching to be done from the main
track and/or a siding. |