Wisconsin Rapids, June, 2018
|
It showed up as just pipes and braces, to be bolted together like an erector set, which took 4 days. |
The large yellow crane arrived on a Friday morning. The tower sections are bolted into two large sections and one skinny tower, so I presume this tower went up in just 3 lifts. |
.
.
.
In less than 8 hours, its up. .
and by Monday afternoon it has 3 directional antennas (not shown here)
that are aimed towards Stevens Point
This page was wrote in June, 2018