TrainWeb.org Facebook Page
Water Tower Diorama Track Laying
Ridley Keystone & Mountain Railroad

The Road to Fantasy

The Water Tower Diorama

Track Laying

The track and road bed have been laid


For the roadbed I selected Woodland Scenics Foam Roadbed. I used white glue to attach the roadbed foam to the pink foam. I used some scrap wood and weights to hold down the foam roadbed. I let it dry for several days.

Picture showing the different foam pieces

Next came laying the track itself. For the track I selected Atlas Code 100 Snap Track. I attached the track to the roadbed with white glue. I left the track over hang the edge of the diorama by three ties length. I did this because I felt it would aid me later in adding the diorama to a layout. This over hang has been a welcomed trait as it has allowed me to easily hook the diorama to the temporary layout track. On another future diorama I did not provide this over hang and I have some difficulty connecting that diorama into the layout.

Overhead view showing the form of the diorama

Another benefit of the track and roadbed is that it will also help to hold the two foam base pieces together.






Back to Construction Index Page
Back to RK&M Home Page
Updated August 5, 2006


::: Made with CoffeeCup : Website Design Software & Web Hosting :::