The frames are complete. |
This is the West section in the foreground. |
 |
North section on the left. The East section in the back. |
Looking down the length of the South section. |
A shot from the Southeast corner. In the back is a 2 turn helix. |
Leading the SP Daylight on the North section is a GS4 4-8-4. |
The central section on the right with the yard on the left. |
South section again from the other side. |
| |
East section. The big X in the track is the interchange between the 2 separate loops |
Three t's pass in the background. The mountain hides a 2.5 turn helix that will bring the train 10 inches above the table. |
| | |