The tracks will run through a cut in the hills on the
lower level just outside of the city.
The upper deck will contain our city - and one mainline. The two main tracks
on the lower level will pass through a cut in the rocks - and will cross under a
highway bridge joining the two upper decks. The near left turnout (still to be
laid) will run under the city to the staging track on the inside of the layout..
(You are here: SJSG Home -> Layouts -> New Layout
Index -> Picture16)