TrainWeb.org Facebook Page
News Event-01
Putting it all away Basic layout without the curtains, scenery and backdrops

Our existing 10ft x 20ft 12 section layout is shown with the cross-bracing for the legs already removed for tear-down. Four people can setup the layout in about 90 minutes. Teardown takes a little longer because we try to be neat and organized so the next setup will go smoothly (well, at least we try. . .) (L-R) Dave Pierce, Walt Mumie and Tom Williams are trying their hand at packing.

Home Index Prev Next

(You are here: SJSG Home -> Layout -> Layout  Index -> Picture01)