The branch and main lines enter a tunnel at the right
end of Roger Sears' copper mine module set. There are
sidings inside the tunnel that can be used to assemble
and put away trains with less disruption to the
operation of trains on display. The mountain line also
has a hidden setup siding.
Photo by Robert Cruse.
Added June 6, 2003