1) I used the ping pong table to lay out my track design.  I cut 1x4 and other wood scraps to make the inclines. As you can see the the gradual incline allows for long trains. more
2) I disassembled the track, put a sheet of plastic over the table.  Reinstalled the track, upside down.
quiz_part1.JPG
Dsc00044.jpg
3) Gathered up all kinds of trash to define the desired contours.
4) Bond paper & masking tape are used to cover (but not distort) the surface that will become the road bed.
Dsc00045.jpg
Dsc00047.jpg
5 & 6) Contours are smoothed using poster board, bags of shipping 'popcorn' and more bond.  
 
Dsc00050.jpg
Dsc00051.jpg
7) Up to this point we have only been working on the plug, that will define the layout, all this stuff is mearly defining the contour of the layout.  
8) With a second layer of plastic in place, we can now start working on the materials that will become the layout.
Dsc00052.jpg
Dsc00053.jpg
9) I had some drywall joint compound that I used to as paste.  The paper is left over from a political campaign.  The tunnel opening must be carefully contoured.
10) One full  layer did not take too long.  
Dsc00055.jpg
Dsc00060.jpg
11 & 12) I added a couple boards around the edges to push the paper down against the table surface.
Dsc00059.jpg
To learn more about S-Trax visit Showcaseline.com