TrainWeb.org Facebook Page
THE REALISTIC WAY…
unoffical page   ---   S-Trains
BK ENTERPRISES
12874 County Road 314B
Buena Vista. Colorado 81211-9102
719-395-8076
E-Mail - Bktruscale@aol.com

THE REALISTIC WAY…

 Prototype railroad track consists of two rails spiked to wooden ties resting on a bed of ballast for drainage. This ballast may be gravel, cinders or any of several kinds of crushed rock, usually limestone or granite. In model railroading, we add the ballast to the trackwork for increased realism. Many modellers think this type of trackwork is too difficult to build, but if the following suggestions a re followed, becomes quite simple and easy. We hope you will give it a fair try.

After you have decided where the track is to be laid, mark the roadbed with a pencil where the ties should be placed (two parallel lines). Paint about 2 to 3 feet of roadbed with a watered down white glue, only enough so that it does not dry while you are working. Set the ties in position the full length of the painted section. Some hints, if we may: If you are putting; down ties for a modern mainline, make them even and straight If they are for an older line, sidings, branches, and yards, do not lay the ties too straight. Should one or two be a bit out of line here or there, the trackwork will look more realistic.

A typical stretch of track will have ties in all stages of weathering because old ties are replaced only a few at a time. Ties are spaced about 3000 to the mile. This comes to about 36 ties per actual foot in S scale. standard gauge. Narrow gauge ties are spaced a little farther apart. As a rule, ties should be a tie width or less apart on mainlines, and 1-1/2 to 2-1/2 tie widths apart on branch lines.

With the ties in position, sprinkle on the ballast. Some modellers use salt shaker or similar device, some use a teaspoon; any method that works for you works. You will have to determine for yourself the length of roadbed that you can work without the glue drying. While this section is drying, you can move on to the next section . After* a section is dry, remove excess ballast with a small soft brush or vacuum cleaner with a cloth tied over the nozzle. This excess ballast can be used again. There will always be spots where the ballast does not adhere, so fix these spots at this time. Also make sure that the ballast is not above the tops of the ties.

When completely dry, begin laying the rails. It is important to remember that turnout should be laid first, and then the rail laid to the turnouts, not the other way. Hold the needle nose pliers in a fist, thumb up and nose down. Push the spike in at a slight angle under the rail. It will not take long to get use to doing this.

Place the turnout on the ties using the frog as a center guide. Always, and this is important, place the frog in position first, and spike it down. Then the stock rails may be spiked in place. We suggest using a least 2 3-point track gauges to key the rails roughly in place and an NMRA Stands gauge for the final spiking. If you an assembled turnout, remove the straps as you work. -Always check and recheck the gauge with the Standards gauge.

We suggest using small spikes for code 70 through code 125 rail, and medium spikes for code 145 rail. Code 40 and 55 should be glued WITH PLIOBOND or like glue, not spikes. Code 70, 83 and 100 could also be glued.

 NOTE!! If ordering turnouts for crossovers, please state this on the order form so that we can add length to the frog points.

 Prices are subject to change without notice.