Visit the TrainWeb.org Fan Page on Facebook!
Your Ad Here
Page Title

JULY 2004
Work continues and the mainline advances

07/12/04:  By this date I had put the tunnel in, which I made with a piece of corrugated drain pipe.  Once I got the tunnel in I had to dig down and make a trench for the tracks to keep the grade to a minimum.  Next I put in the large curve at the rear of the layout and the crossover and connecting leg of the wye which would connect to the storage tracks in the tool shed. Then I cut a hole in the side of my tool shed for the track to enter the structure.

Visit the TrainWeb.org Fan Page on Facebook!
Create your own free Rail Blog or Website!

Advertise | About Us | Contact Us | Sign up for our Newsletter | TrainWeb.com

Your Ad Here
Your Ad Here