Christmas / New Years 1984 There may be a slight delay before the slideshow operates. |
#1 VIA CNR Cover Page #3 & #4 Partial Christmas & New Years Plan Outline, Dates, Anchor Plan #5 Before the computer, manual Timetable Worksheets were used to determine a passenger train schedule #6 In the event of needed changes a Substitute Train Plan (backup plan) was created - the 600 numbers also included the GO consists #7 & #8 Times for Loading of Passengers - several 600 numbers are GO consists #9 30 CN 9400s were modified for 80MPH and leased to VIA - they were allocated in specifc locations like London, Oshawa, Brockville etc in case of VIA and/or GO locomotive failure (none were used with GO) #10 & #11 Notes on GO equipment use |