Tembec shut down the mill July 31, 2006. It was closed permanently
December 5, 2006. Tembec announced March 29, 2011 sale ($16.5M) of their hydro-electric
generating (7.4 megawatts) assets in CANX 1518 Smooth Rock Falls, ON. SW1200 ex GTW 1518 EMD 25750 3/1960 Mike Robin Note: CANAC Inc. replaced ONR as the switching contractor effective April 1, 2004. Retired by CN 6/09/1997 and became CANAC lease unit. Sent December
1997 to Rouge Steel, Detroit.
Mattagami
RR 100 2-6-0 on display, from the cab of ONR 1805 entering Smooth Rock Falls yard.
May 2001
| ||||||
Back
(Use your browser Back button) Old Time Trains © 2009 2014 2016
|