| Bob is working on a three-layer HO layout in a spare bedroom.
The top layer has been laid out and scenery is in place. Bob is planning
to install "Tortoise" switch machines on that layer. The lower two
layers are still under construction, and Bob has a real challenge with
them since they are so close to one another. There are no plans as
of yet to connect the top layer with the other two, so the layout will
end up operationally as two separate layouts in the same space.
While Ted did not get any photos of this layout, the following contributions
by Ron Tucker will fill in the blanks quite nicely. Thanks, Ron! |