Current Status: Operational, under restoration with estimated completion less than one year

Pictures appear in somewhat chronological order


Above: Joe Stupar and Roger Hewett inspect the charging/clock box under the car.


Above: Another shot of completed seats in the main coach section.




Above: Three pictures taken during painting of the letterboards


Above: The first test run after re-installation of the controller and wiring on the #1 end.


Above: A night test run after repairing additional electrical problems on the car.


Above: Newly installed floor boards on the #1 end. These will be covered with tarpaper.


Above: The #2 control end, after removal of the controller for cleaning and painting.