Pictures appear in somewhat chronological order
Above: Joe Stupar and Roger Hewett inspect the charging/clock box under the car.
Above: Another shot of completed seats in the main coach section.
Above: Three pictures taken during painting of the letterboards
Above: The first test run after re-installation of the controller and wiring on the #1 end.
Above: A night test run after repairing additional electrical problems on the car.
Above: Newly installed floor boards on the #1 end. These will be covered with tarpaper.
Above: The #2 control end, after removal of the controller for cleaning and painting.
749 Page 1