Your Ad Here
Museum Photos Right

Northern Ohio Railway Museum
PO Box 458
Chippewa Lake, Ohio 44215-0458
Phone: 330-769-5501

 
NORM Home Page
Museum Information
Museum News
Museum Events
Then and Now
Our Collection
Museum Store
Museum Photos
Membership
Directions
to the Museum
Trolley Museum
Links & Resources

Museum Photos
Right-of-Way Progress

Right-of-Way construction is an ongoing and very important process for our museum so that we might be able to operate our cars! 

Walt Stoner setting spikes (11/01)

The whole crew is setting spikes (11/01)

This looks like a view from a "prosperity special " crossing the plains of Ohio - but you are actually looking at several cars stored on the south side of Buffham Rd., as seen from across the farm fields ( note the deer tracks in the foreground ) as seen from Ryan Rd on 1 - 2 - 01

Here is LSE 42 and LSE 181 together again, along the northerly side of the barn as the barn lead track work progresses towards them (J. Kostelnik) (Summer 2000)

Our track mobile and four wheel crane car are ready for service. The flat car between them is used for building the railroad as well as giving rides to the workers (S. Heister)

View of the carbarn with operating switch. Switch throw is one obtained from RTA Windermere yard. It was rebuilt by Walt Stoner (S. Heister)

This is a view across the barn lead looking toward Buffham Road. CSX is operating a train loaded with coil steel and coke towards Seville. Just ahead of the first engine are several of NORM's stored cars on the South side of the road. (J. Kostelnik)

Looking easterly across the stored rail at the new siding lead as it extends towards the side of the barn. (J. Kostelnik)

Here is a view of the track work in front of the barn. The switches shown will lead to the storage track down the left side of the barn, and the three barn leads. Also under construction ( off to the right ) is the last switch to the track that will run down the right side of the barn. Car 31 is further down on the left, waiting for the track work to reach it, while car 42 is on the Right, awaiting the track to be finished next to it so it can be re-trucked.

Now how about this view - straight out the back windows of SHRT 031 looking at the new track work heading right towards it! (J. Kostelnik)

This photo shows the progress of the south wye switch, looking north. The car barn is located to your left. The right-of-way continues ahead.

Here volunteers are shown working on the wye.

This photo shows the equipment stored south of the Buffman road crossing. The CSX trackage is visible to the left.

First rail being laid at the Museum in 1979! That is C&LE # 105 in the background.

Back to Top



Last updated 02/18/08


 

For questions or comments about N.O.R.M. use our Feedback Page  or contact:
Walt Stoner at wstoner001@neo.rr.com
For comments or question about this website, contact the webmaster Dale Rothenberger

Site Index
NORM Information  |  Collection  |  Membership  |  News  |  Museum Store  |  Links  |

Northern Ohio Railway Museum (NORM) is a Ohio Non-Profit Educational and Historical Organization. It is recognized by the IRS as a Not-For-Profit public benefit Corporation under Section 501(c)3. Any material contained in this web site may not be reproduced in any form without the expressed written consent of NORM, © 1998-2008 all rights reserved.

Web space provided as a courtesy by  Trainweb

  Free Web Hosting Since 1996. Join & Become Part of the TrainWeb's Railroad Community.
The following uses RAILsearch.com to search just rail related websites: Google Custom Search
About Us  |  Advertise | Contact Us Tell a friend about this page  |  Sign up for the TrainWeb Email Newsletter