As of 2009, the existing tunnel was getting
somewhat
worn, and storage in the trailer was a problem, as the tunnel had to be
removed from the module, strapped to its own carrier, and that carrier
loaded atop two of the module racks. It was decided to replace
the tunnel with one that could remain atached to its corner module when
stored in the trailer. Jay Reese took on the responsibility of
designing and fabricating the new tunnel.