TrainWeb.org Facebook Page
MVSG Tunnel Replacement  

Miami Valley S Gaugers

Last Update 3/10/2010

MVSG Home Page

Modifications Page

Tunnel Replacement

As of 2009, the existing tunnel was getting somewhat worn, and storage in the trailer was a problem, as the tunnel had to be removed from the module, strapped to its own carrier, and that carrier loaded atop two of the module racks.  It was decided to replace the tunnel with one that could remain atached to its corner module when stored in the trailer.  Jay Reese took on the responsibility of designing and fabricating the new tunnel.

Old tunnel       
The old tunnel                                                         The new tunnel (March 10, 2010)



        New tunnel

New tunnel       

       

       

<>      

March 10, 2010:

       

         

MORE PICTURES TO COME.