McCloud Rails : Passenger Operations: Excursion Photos
Steam Locomotives #18 and #25 Together: 21 February 2001 The first run of the #18 after its restoration to service occurred on 21 February 2001. The #18 and the #25 worked together to take a heavy passenger train to Bartle and return. This trip marked the transition from the #25 to the #18, as the #25 has not operated since this trip. |
|
|
The #18 and #25 backing from the shop area towards the depot. Travis Berryman photo. |
|
|
The #18 and #25 leaving the McCloud depot. Roger Titus photo. |
|
|
The excursion at speed near Bigalow. Travis Berryman photo. |
|
|
The double header arriving at Bartle. Roger Titus photo. |
|
|
Another shot of the two locomotives at Bartle. Roger Titus photo. |
|
|
The two locomotives plowed part of the Bartle siding for the photographers. Travis Berryman photo. |
|
|
The two locomotives on a photo runby at Bartle. Roger Titus photo. |
|