Index Page [<< Prev] [Next >>]
1 Looking west along the north wall before construction of the new backdrops 2 3 Looking south from the north wall at what used to be the office 4 Looking east along the north wall 5 The N.W. corner before any new construction 6 7 The orrigional "yard" before any new construction 8 The origional layout after removal of the old office wall 9 Looking east into the orrigional layout after removal of the office walls 10 The N.W. corner after new wall studding was in place 11 Another shot of the north wall 12 Looking east from the south wall showing the south side of the center divider 13 Looking east into the orrigional layout showing new backdrop studding 14 New orrigional yard after backdrop studding 15 Looking west from the S.E. corner showing new studding and sheetrocked ceiling 16 North wall with the masonite in place 17 Looking east along the north wall through the duck-under 18 A shot of the end of the center divider and south wall 19 The orrigional yard after the backdrop was installed 20 East end of the orrigional layout 21 S.W. corner of the new room 22 Lou preparing to remove a section of the old layout 23 James working on the first peice of the new benchwork 24 Some cleaning after the center section of the old layout was removed 25 More benchwork... 26 S.W. corner after benchwork..see photo 21.. 27 N.W. corner after benchwork..see photo 9 28 Lou & Gary setting switches 29 James building an L-girder 30 James & Rob building benchwork 31 James, Rob, & Dave K.working on the benchwork 32 Rob & Dave K. hard at it 33 Rob & Dave K. assembling the benchwork 34 The N.W. corner ready for track work 35 Gary installing switch machines 36 Lou & James aligning track 37 "Which radius looks best"? 38 The test engines.... 39 Looks good to me.... 40 Testing the trachwork.. 41 The test engines heading into tunnel #3 42 James at the throttle.... 43 Heading through the cut... 44 Testing the new crossover... 45 A great shot... 46 The north wall.. 47 Looking east along the north wall 48 Trying to set the trackwork at the "Y" 49 The test engines at the station 50 ...at track level 51 Another angle of the station 52 Looking at the north wall and duck-under 53 Along the north side of the center wall.. 54 Lou at the throttle 55 Lou inspecting the trackwork... 56 Our switchman... 57 A shot through the cut.. of 57
James & Rob building benchwork
Generated with Arles Image Web Page Creator 3.1