Club Day, August 2009, Carlingford
Our last Club Day was held on 8 August 2009 in Carlingford at the house of Malcolm and Rosalind. The weather was a little on the chilly side but the sun did make an appearance every now and again. The club would like to thank the hosts Malcolm and Rosalind for making it such a successful day.
Malcolm's layout is one loop with a tunnel at one end and a bridge at the other. There is an incline above the tunnel especially built to run Malcolm's scratch built rack-loco.