JLS Railroad P4 Signal Installation

P4 Signal Installation

The following addition was planned and carried out by Joe Barcia and Skip Densing. The small addition of a 2 arm semaphore signal will actively protect the 30 degrees crossing where the P4 Passing Siding crosses the 3rd Line. The signal is wired into the P4 turnout. When the turnout is switched, the signal will read stop, allowing cross traffic from the Main Line to traverse the 3rd Line's 30 degree crossing without accident. When the switch is normaled, the signal will read proceed, allowing normal operations to continue.

click any smaller picture to view a larger picture

P4 Signal, seen in the foreground of the photo, P4 switch and the P4 Passing Siding are located to the left of the photo.

A wide shot of the area where the P4 signal was installed.

 