Back to Ore Bridge Home Page Back to Projects Folder
[..or, "How I Spent my Christmas Vacation."]
The finest gift I got this Christmas was TIME... time to complete a number of small tasks that enabled me to connect the subassemblies (span and legs) together, so that my structure finally begins to resemble an actual ore bridge. This is a MAJOR turning point for this project - all that is left for me to do is the detailing (walkways, stairs, handrails, etc.) and the tram/bucket.
I had originally set a goal for myself to have the legs and truck shoes joined by the end of the calendar year, and I succeeded by a micro-thin margin. So in order to save time and get this posted to my web site before 11:59pm on December 31, I will skip the usual long-winded commentary that accompanies the images.
Click HERE to skip to the full-view image of the assembled bridge
Forward Chassis and Truck Shoes
ob_model_truckshoes_01.jpg
ob_model_truckshoes_02.jpg
ob_model_fwd_foot_assy_05.jpg
ob_model_fwd_foot_clearance.jpg
Finishing and Joining the Rear Legs
ob_model_rear_legs_jct_brace.jpg
ob_model_rear_legs_joined.jpg
ob_model_rear_legs_joined_w_braces.jpg
ob_model_rear_joint_bracket01.jpg
ob_model_rear_joint_bracket02.jpg
ob_model_rear_legs01.jpg
ob_model_rear_legs02.jpg
ob_model_rear_truckshoes.jpg
Joining the Forward Legs
ob_model_fwd_joint_brackets.jpg
ob_model_fwd_joint_before_trim.jpg
ob_model_fwd_joint_after_trim.jpg
ob_model_fwd_legs_clip_on.jpg
ob_model_fwd_legs_w_joint_braces.jpg
Overall Views of Semi-Finished Bridge
ob_model_full_exoskeleton.jpg
ob_model_frontal.jpg
BTW: HAPPY NEW YEAR!
-KJL
Back to Ore Bridge Home Page Back to Projects Folder
.