TrainWeb.org Facebook Page
Klamath Northern- 3 September 2025 Freight Operations


Klamath Northern
3 September 2025 Freight Operations


On 3 September 2025 Luke Noltensmeyer and Parker Gibson followed the #207 as it delivered a single lumber load to the interchange and then returned light to Gilchrist. Thanks to Luke and Parker for making the trip and sharing your photos!

The #207 departed the sawmill before sunrise and is seen here near the former site of Glanville Box Company mill. Parker Gibson photo.

The #207's headlight beam pierces the morning mist on the southbound trip. Luke Noltensmeyer photo.

The ballast spread during the track work in 2023 is evident near Milepost 5. Parker Gibson photo.

Rounding a curve farther south on the line. Parker Gibson photo.

The #207 crossing Highway 58 a few miles north of Gilchrist Junction. Parker Gibson photo.

The short train arrived to Gilchrist Junction to find one of the yard tracks filled with Union Pacific track maintenance equipment. Luke Noltensmeyer photo.

The #207 starting its return trip to Gilchrist after spotting the single load on the interchange tracks. Parker Gibson photo.

The #207 emerging from a tunnel of trees near Milepost 1. Parker Gibson photo.

Almost home. The #207 at Milepost 9 near Crescent. Parker Gibson photo.

The #207 crossing Highway 61 in downtown Crescent. Luke Noltensmeyer photo.

The #207 arriving back in the Gilschrist sawmill. Luke Noltensmeyer photo.

With no cars to spot, the #207 headed direction for the enginehouse, and the crew's day will be done by 9 a.m. Parker Gibson photo.