|
Klamath Northern 3 September 2025 Freight Operations |
|
|
|
On 3 September 2025 Luke Noltensmeyer and Parker Gibson followed the #207 as it delivered a single lumber load to the interchange and then returned light to Gilchrist. Thanks to Luke and Parker for making the trip and sharing your photos! |
![]() |
|
The #207 departed the sawmill before sunrise and is seen here near the former site of Glanville Box Company mill. Parker
Gibson photo.
|
![]() |
|
The #207's headlight beam pierces the morning mist on the southbound trip. Luke Noltensmeyer photo.
|
![]() |
|
The ballast spread during the track work in 2023 is evident near Milepost 5. Parker Gibson photo.
|
![]() |
|
Rounding a curve farther south on the line. Parker Gibson photo.
|
![]() |
|
The #207 crossing Highway 58 a few miles north of Gilchrist Junction. Parker Gibson photo.
|
![]() |
|
The short train arrived to Gilchrist Junction to find one of the yard tracks filled with Union Pacific track
maintenance equipment. Luke Noltensmeyer photo.
|
![]() |
|
The #207 starting its return trip to Gilchrist after spotting the single load on the interchange tracks. Parker
Gibson photo.
|
![]() |
|
The #207 emerging from a tunnel of trees near Milepost 1. Parker
Gibson photo.
|
![]() |
|
Almost home. The #207 at Milepost 9 near Crescent. Parker
Gibson photo.
|
![]() |
|
The #207 crossing Highway 61 in downtown Crescent. Luke Noltensmeyer photo.
|
![]() |
|
The #207 arriving back in the Gilschrist sawmill. Luke Noltensmeyer photo.
|
![]() |
|
With no cars to spot, the #207 headed direction for the enginehouse, and the crew's day will be done by 9 a.m.
Parker Gibson photo.
|
|
|