Wanted to share an
experience integrating my MRC PA2 system with a CVP Zonemaster saga. Basically
I had the PA power about 1/3 of the layout. As the layout expanded, I bought a
CVP Zonemaster to power the other 2/3.
All worked well, except I
had an intermittent problem with boosters tripping out when a loco crosses
between two boosters. One booster is my MRC command station; rated at 3.5 Amps.
The other is a CVP Zonemaster Single, rated at 7 Amps. I measured the voltage
and the rails were properly wired. In fact, if it is just a single loco,
usually there is no problem. However if I had a 2-3 unit lashup of sound
equipped locos, one or both boosters trip out on an overload. Both boosters
handle all the loads just fine normally. I checked the wiring and all the
tracks in both booster districts are truly separate, and the DCC signals are in
phase. So all the usual suspects were accounted for.
Three sources of problems
were identified. Most important was that the CVP uses a different power
switching scheme than the MRC. Some help from the MRR Electronics list
identified incompatibility between different brands of boosters. MRC, CVP, NCE
and Digitrax all use a single DC supply inside that reverses the power supply
supply to the rails for each signal phase. However MRC and most European
systems have a split 14 volt supply that alternate which rail gets power
instead of switching each rail between the positive and negative supplies. Thanks to Graham Dredge of Westimation
for his help in sorting this out and drawing up a sketch of the differences….
This has caused lots of
problems for NCE users that have tried to add a CVP ZoneMaster booster. (His
suggestion is never to mix boosters – a wise thought.) The second issue might
have been a slight phase shift in the DCC signal. Because the DCC input signal
to the CVP has to go thought the opto-isolated input and it's logic, it is
likely that a slight time delay was introduced. When locos crossed the gaps
between boosters, this created signal noise to the decoders. Finally, the two
DCC systems ran at slightly different voltages, about a 1.8 v difference.
So the solution I came up
with was to buy a second CVP booster and have it power what the MRC did. OK, not
exactly an earth shattering lighting bolt idea, but what it does is creates an
identical power feed scheme for both booster districts. Symmetry.
It’s a good thing. Even the
Romans and Greeks thoughts so.
I ordered a second Zonemaster and
connected it into the layout identically as the first. As such, the MRC PA is
no longer directly connected to the tracks in any way. Lo and behold, it works great!
Not the slightest hesitation when crossing boosters. I jumpered one rail
together and measured the voltage across the gap on the other rail - 0.2 volts
difference. Much, much better than the 1.8 volts I had before. So between the
booster design matching, the phasing issue being removed and voltage matching,
we have success.
During all this testing,
apparently I did create a surge somewhere along the line and fried an output
from a stationary decoder. (I also had to reset and reprogram a couple locos as
they did not appreciate all the DCC noise that this problem caused.) As I was
thinking out the new DCC system topology, it occurred to me that the 3.5 A out
of the MRC PA would essentially create a 'quiet' bus. So I rewired all my
stationary decoders to the MRC output. Now they are in a place on the system
that will never see shorts or surges. Very happy about that. I have considered
extending this lead out to my workbench for the same reason. I drew the new
system topology up and posted it in the files section. Not everything is shown,
but it gives the idea.
Thought it might be useful
to those of you who have a PA and want to expand its capacity beyond what the
command station can supply.
Regards,
Detlef