Your Ad Here
GIRR Graded

The Geologically Improbable Railroad

The grading of the layout is complete

[ Home ] [ Up ] [ Previous Picture ] [ Next Picture ]

grading complete The main grade around the outside of the yard has been established. Before this happened, a brick wall and walkway was installed next to the house and a short block wall was built at the base of the ivy covered fence to define a DMZ for the ivy.

The track that goes around the mountain is supported on a 4" wide block wall that also holds the mountain in place. This wall, and all other features of the layout, were placed by the numbers from the CAD files for the layout design. Everything fit as designed.



© 1997 George Schreyer
Last Updated Nov 4, 1999
  Free Web Hosting Since 1996. Join & Become Part of the TrainWeb's Railroad Community.
The following uses RAILsearch.com to search just rail related websites: Google Custom Search
About Us  |  Advertise | Contact Us Tell a friend about this page  |  Sign up for the TrainWeb Email Newsletter