Phase 2 "Before" Photo TourWith constuction beginning on Expo Line's phase 2 to Santa Monica, here is a series of "before" photos to remember how it used to look, travelling from downtown Santa Monica to Palms.
7/27/11 — Colorado Avenue looking west from 5th Street, where the tracks will curve left into the terminus station
7/27/11 — Colorado Avenue at 6th Street; the entrance to the Big Blue Bus yard is on the right.
5/27/11 — Colorado Avenue at Lincoln Boulevard
5/27/11 — Colorado Avenue at 9th Street in Santa Monica
5/27/11 — Colorado Avenue at 11th Street
5/27/11 — Colorado Avenue at 12th Street
5/27/11 — Colorado Avenue at 14th Street; the former Fisher Lumber is on the right.
5/27/11 — Colorado Avenue at 16th Street; Colorado will be widened for the 17th Street station where the dark building is.
5/27/11 — Colorado Avenue at 17th Street, where Hastings Plastics and Swartz Glass will be removed for the tracks will curve to the right onto the private right-of-way
7/27/11 — Right-of-way east of 17th Street behind Hastings Plastics
7/27/11 — Right-of-way east of 19th Street
7/27/11 — Right-of-way east of 20th Street
7/27/11 — Right-of-way crossing Olympic Boulevard at 21st Street
8/4/11 — Looking east toward Cloverfield Boulevard, the auto repair shed is on the right-of-way.
7/27/11 — Right-of-way on south side of Olympic Boulevard east of Cloverfield Boulevard
7/27/11 — Right-of-way on south side of Olympic Boulevard east of 26th Street (Bergamot Station)
4/25/11 — The Rose Garden Nursery is on the right-of-way on the east side of Stewart Street, south of the Lantana office campus.
4/25/11 — Looking east from Stewart Street and Exposition Boulevard you see the future maintenance facility site, current Santa Monica College parking lot and Verizon facility.
8/4/11 — Right-of-way on north side of Exposition Boulevard, east of Centinela Avenue
8/4/11 — Right-of-way on north side of Exposition Boulevard, looking east from Bundy Drive,
8/4/11 — Right-of-way on north side of Exposition Boulevard, approaching Westgate Avenue
8/4/11 — Right-of-way on north side of Exposition Boulevard, approaching Granville Avenue
11/4/11 — Northwest corner of Exposition Boulevard and Barrington Avenue, the metal gate right-of-center is over the former track.
11/4/11 — Around the corner of Barrington Avenue and Exposition Boulevard (north)
8/4/11 — Right-of-way on north side of Exposition Boulevard, east of Barrington Avenue
8/4/11 — Right-of-way on north side of Exposition Boulevard, converging on Pico Boulevard
8/4/11 — Exposition Boulevard continues east, south of Pico Boulevard
8/4/11 — Right-of-way crossing Pico Boulevard
7/27/11 — The right-of-way west of Sepulveda Boulevard has become a staging area for Skanska-Rados.
8/4/11 — Right-of-way on north side of Exposition Boulevard, east of Sepulveda Boulevard
7/27/11 — Exposition Boulevard looking east from Military Avenue
5/27/11 — Just to the left, up on the right-of-way, looking east of Military Avenue
5/27/11 — Looking west from Selby Avenue at Exposition Boulevard
5/27/11 — Looking west on the right-of-way toward Westwood Boulevard
5/27/11 — Turning around and looking east toward Overland Avenue
5/27/11 — Right-of-way on south side of Northvale Road at Bradbury Road, looking west
5/27/11 — Right-of-way on south side of Northvale Road at Clarkson Road, looking west
5/27/11 — Right-of-way on south side of Northvale Road at Dunleer Drive, looking east
5/27/11 — Right-of-way on south side of Northvale Road beneath Palms Park pedestrian bridge
5/27/11 — Right-of-way looking west from pedestrian bridge
5/27/11 — Right-of-way looking east of pedestrian bridge, where an old oil pipeline has been removed
11/29/11 — The plate girder bridge over Motor Avenue looking north (above) and south from under the I-10 bridge (below)
8/4/11 — Looking east toward the bridge (below) from the driveway up from National Boulevard to the right-of-way
5/27/11 — The existing bridge over National Boulevard at Palms Boulevard
7/27/11 — The right-of-way north of Exposition Boulevard, looking east toward Bagley Avenue, where dirt had been piled for the Phase 1 construction |
|