On 29 March we built three 2' X 5' frames that will be the base for a 15
foot long icing facility.
Here is one of the frames.
All three frames are built and have foam
in the tops. We still need to build legs, but Karl can now start of the
roadbed, track, buildings, wiring and scenery.