1.
A 'wye' with a crossing
on one leg 2. Reverse
shot 3. Different
angle, with two more trees 4. Section
between the "wye's 5.New
switch leading into the 'wye' 6.Reverse
shot of #5 7.Side
view of same area 8.Viewing
the future Fort Churchill area 9.Fort
Churchill area 10.Train
on new track through the crossing 11.Engine
on test run on new track 12.Track
now goes over the Summit 13.The
Summit, heading toward the Tunnel 14.Inspection
train cresting the summit 15.Train
entering Summit Tunnel 16.North
end of the Summit Tunnel 17.South
end of Summit Tunnel 18.Train
skirting the pond 19.Track
looking towards a future 'wye' 20.
Train in future 'wye'
section 21.
Looking North from one
'wye' to the other 'wye'
22.
23.
24.
25.
26.
27.