1.The
New area being shaped 2.Another
angle of same area 3.New
trestle in place in Lizard Canyon 4.More
track in Lizard Canyon 5.Test
train through Tunnel and Canyon 6.A
nice look a the caboose in tunnel 7.A
look down the canyon along new track 8.Next
few photos are of the caboose in canyon 9. 10. 11. 12. 13. 14.I
also built a siding called Bear Flatt 15.Bear
Flatt is on the first section built 16.This
small siding can be used as a passing siding 17.There
are more photos on the Bear Flatt link 18.Trees
and shrubs are being planted 19.This
is a working culvert I built for the railroad 20. 21. 22.The
work on the river continues 23.Some
plantings on the Desert Springs area 24.Two
scratch built Stub switches, just installed 25. 26.The
Yard lead, main line, test train 27.
Test train 28.
30 feet of new track on other end 29. 30. 31.
Over view of north end of the RR 32.
Plants on same new section 33. 34.
Mountains and plants on Desert Springs area 35.