  1.    The New area being shaped
  2.    Another angle of same area
  3.    New trestle in place in Lizard Canyon
  4.    More track in Lizard Canyon
  5.    Test train through Tunnel and Canyon
  6.     A nice look a the caboose in tunnel
  7.     A look down the canyon along new track
  8.      Next few photos are of the caboose in canyon
  9.
 10.
 11.
 12.
 13.
 14.    I also built a siding called Bear Flatt
 15.    Bear Flatt is on the first section built
 16.    This small siding can be used as a passing siding
 17.    There are more photos on the Bear Flatt link
 18.    Trees and shrubs are being planted
 19.    This is a working culvert I built for the railroad
 20.
 21.
 22.    The work on the river continues
 23.     Some plantings on the Desert Springs area
 24.    Two scratch built Stub switches, just installed
 25.
 26.    The Yard lead, main line, test train 
  27.   Test train
 28.    30 feet of new track on other end
 29.
 30.
 31.   Over view of north end of the RR
 32.   Plants on same new section
 33.
 34.   Mountains and plants on Desert Springs area