gr1
1997
Construction
Of
The
DS&RG
Outdoor Railroad
The pictures follow the
progress of the construction of the Outdoor Railroad
Click
on The underlined word to view the Photo
~~~
Photo
01
This
photo shows the the first two days of work
~~~
Photo
02
This photo shows the future
positions of two trestles.
Plus it shows a small amount
of the tons of rock that had
to be hauled in and the
yards of sand that was dug and
moved for the
DS&RG
~~~
Photo
03
This photo shows a stock
Bachmann train in a static pose for
the purpose of checking
clearances from the rocks. I also got to
see what my trains will
look like when I finally get to run trains.
I got more drive to get
more track down alot faster, after
seeing the trains out there.
~~~
Photo
06
This photo shows the comparison
to the first photo on
the lead page.
~~~
Photo
05
Photo
07
Photo
08
Photo
09
Photo
10
This
is the only known model of this unusual design
of this trestle.
~~~
Photo
11
Photo
13
Photo
16
Photo
18
This Photo shows a 1/24
scale, scratchbuilt trestle, using Redwood.
It stands two feet tall
and is eight feet long
~~~
Photo
19
Photo
20
Photo
22
~~~
I
now have more photos at links below
1998
Photos DS&RG
1999
Photos DS&RG
2000
Photos DS&RG
Switching
Yard
1
Feb. 2000