TrainWeb.org Facebook Page
change1
Changes!
We all need change to keep our lives new..
And so does the DS&RG!
The first change to be made on the Railroad
has been done. This was not so much a change,
but an enhancment of what I had done earlier.
It involved moving some rock work closer to the
rails. This was to make the train look better as it
was passing through the area.
Feb. 1999 Photo 1  Change
I enhanced the look of this area
Feb. 1999 Photo 2  Change
I have moved the rock work closer to the track
June 2000  Photo 3  Change
I have removed the rocks lining the right side of the tracks
June 2000  Photo 4  Change
I have removed the rocks lining the left side of the tracks
Jan. 2001  Photo 5  Change
I have Rebuilt most of the switches with new #8 frogs
and redesignes the track plan.
Mar. 2001  Photo 6  Change
I have rebuilt the Bear Flatt siding.
Back to Switch Yard 
Updated
15 March 2001