change1
Changes!
We
all need change to keep our lives new..
And
so does the DS&RG!
The
first change to be made on the Railroad
has
been done. This was not so much a change,
but
an enhancment of what I had done earlier.
It
involved moving some rock work closer to the
rails.
This was to make the train look better as it
was
passing through the area.
Feb.
1999 Photo
1 Change
I
enhanced the look of this area
Feb.
1999 Photo
2 Change
I
have moved the rock work closer to the track
June
2000 Photo 3
Change
I
have removed the rocks lining the right side of the tracks
June
2000 Photo 4
Change
I
have removed the rocks lining the left side of the tracks
Jan.
2001 Photo 5
Change
I
have Rebuilt most of the switches with new #8 frogs
and
redesignes the track plan.
Mar.
2001 Photo 6
Change
I
have rebuilt the Bear Flatt siding.
Back
to Switch Yard
Updated
15
March 2001