My old layout has been put out in the garage. I bought a 3 piece partially complete module layout of a friend of mine and I'm happier with it so far. Its 14 feet by 4 feet folded dog bone. Here are the start of the pictures on CPPE Phase 2.
Track Painting and Ballasting
Snow Shed 3 Jan 2007
This is my first attempt at scratch building with styrene
Road work and some ground foam along the mainline, the roads are made with ready to use drywall mud. Spread between WS paving tape and finished with WS asphalt top coat.
Progress on the roads and ground cover as of 20 Aug 07