New Haven Coal Mine Branch of Ann Arbor Railroad
Branch line to New Haven coal mine, known mine operators; Noud-Kean Company, Findly Coal Company, The Liberly Coal Company, Jones Coal Company |
||
0.00 |
Owosso |
start of line, Stanley Street [street was abandoned] at Corunna Ave., switch located in street |
0.16 |
Allendale Ave |
railroad crossing |
0.23 |
Shiawassee River |
bridge |
0.27 |
Gould Street |
Line ran along center of road, in City of Owosso. |
0.27 | Jerome Avenue |
Ended at railroad crossing |
0.37 |
Graver St. |
Ended at railroad crossing |
0.42 |
Comstock St. |
Ended at railroad crossing |
0.48 |
Main St. |
Paved road railroad crossing |
0.61 |
Exchange St. |
Ended at railroad crossing |
0.66 |
Mason St. |
Ended at railroad crossing |
0.81 |
Oliver St. |
Paved road railroad crossing |
0.96 |
Queen St. |
railroad crossing |
1.05 |
King St. |
railroad crossing |
1.34 |
NOTE: |
end of line on 4/26/1961-track chart. |
2.04 |
Middleton |
railroad crossing |
3.04 |
Wildermouth |
|
3.63 |
Township line |
Caledonia & New Haven Townships line, Shiawassee County |
3.63 |
Cronk Rd. |
railroad crossing |
4.65 |
Wood? |
railroad crossing |
5.63 |
Siding |
Approximately 2000 feet along west side of branch |
6.52 |
culvert |
mason rubble 4 x 3.5 feet |
6.80 |
Henderson Rd. |
railroad crossing,section line between sections |
7.03 |
bridge |
Branch and two tipple track crossed over 6 Mile Creek |
7.07 |
coal tipple |
Four tracks wide, three tracks through tipple - 288 feet - 1124 feet - 1376 feet |
7.11 |
Private road |
railroad crossing |
7.18 |
end of passing track |
|
7.23 |
spur track |
Possibly used for sugar beet loading |
7.27 |
end of branch line |
|