TrainWeb.org Facebook Page
THE ANN ARBOR RAILROAD COMPANY

THE ANN ARBOR RAILROAD COMPANY

OFFICE OF TRAINMASTER

Owosso —- July 20, 1961

ALL CONCERNED:

We are now receiving gravel for road construction at Rosebush.  This gravel is coming in two sizes, 10-A small size and 4-A large size.

There are two unloading pits in siding at Rosebush for unloading this gravel.  The 10-A small size unloads at east pit and 4-A large size unloads at west pit.  These pits are 4 cars lengths apart.  When switching these cars up to spot, line up in following manner:

4 cars of 10-a small size, then 4 cars of 4-A large size.

This track will hold 24 cars.

D. C. Whitmore

Note: the 4 car blocks were changed to 3 car blocks by hand crossing out.