| Stations |
 |
Delray
Beach |
Not much here, just a
platform, overhangs, and Tri-Rail Ticket Machines |
01/21/02 |
 |
Delray
Beach |
A
look at the East Side of the Delray Station During Construction,
currently the foundation for the overhead staricases is being
poured. |
06/20/03 |
 |
Delray
Beach |
Looking
off to the West of the platform is a staging area for materials
and trucks, temporary barriers for the parking lot can be seen |
06/20/03 |
 |
Delray
Beach |
The
West Stairwell has gone up at Delray Beach, the east stairwell is
being readied for construction when this picture was taken |
07/11/03 |
 |
Delray
Beach |
The
east stairwell is complete, now we wait for the east and west
stairwells to be completed |
08/11/03 |
 |
Delray
Beach |
Both
stairwells are up now, the foundation is being poured for the new
permanent platform |
08/11/03 |
 |
Delray
Beach |
The
overhead bridge has been installed, giving a more complete look to
the two tall stairwells |
10/31/03 |
 |
Delray
Beach |
The
majority of the East Platform has been poured, looks like it'll be
very nice once its done |
10/31/03 |
 |
Delray
Beach |
Close
up of the east stairwell, a portion of the platform still yet to
be poured |
10/31/03 |
 |
Delray
Beach |
Close
up of the overhead bridge that spans the tracks and platforms |
10/31/03 |
 |
Delray
Beach |
Downstairs
on the west platform |
10/31/03 |
 |
Delray
Beach |
Progress
is being made as they've begun to put up the overhang structure
above the stairwells |
02/16/04 |
 |
Delray
Beach |
 |
Delray
Beach |
The
Construction is progressing nicely in Delray Beach, the canopy
structure is hung on the east platform, the east stairwell tower
has a roof, glass has been installed on both towers, gettin closer
and closer everyday to a better station in Delray, all we need now
is a new set of rails, dual crossovers, signals and we'll be that
much closer! |
03/26/04 |
 |
Delray
Beach |
 |
Delray
Beach |
 |
Delray
Beach |
Couple
of changes from the last set of pictures, the West overhang has
gone up, and if you look carefully you can see the roof pieces
going up on the East stairwell |
04/09/04 |
 |
Delray
Beach |
Side
view of the West Strairwell in Delray just about 10 minutes before
the skies open up |
04/12/04 |
 |
Delray
Beach |
Wide
angle shot of Delray Beach |
04/24/04 |
 |
Delray
Beach |
The
roof of the overhang on the east side is starting to go on, doors
for equipment rooms installed, variable message boards installed,
not to mention an exit sign |
04/24/04 |
 |
Delray
Beach |
 |
Delray
Beach |
 |
Delray
Beach |
Doors
have been installed on the west side, but no overhang roof yet,
one interesting tihing to me is that the new platform was poured
about six inches lower than the exsisting platform, this makes me
wonder if the exsisting platform will be torn out and replaced all
together, sort of wasteful IMHO |
04/24/04 |
 |
Delray
Beach |
 |
Delray
Beach |
East
Platform's looking like it's near completion |
06/18/04 |
 |
Delray
Beach |
06/18/04 |
 |
Delray
Beach |
A
truck loaded with cement ties backs down the right of way, by the
end of the day there would be ties all the way through the station |
06/18/04 |
 |
Delray
Beach |
A
view from the Overhead Bridge looking North at the Out Of Service
main and new track |
07/08/04 |
 |
Delray
Beach |
Looking
South from the Bridge you can see all the way down to the Curve at
Yamato, towards the edge of the sightline in this picture (right
next to the curve in I-95) are the Dual Crossovers, word is it
will be named after a person instead of a fruit |
07/08/04 |
 |
Delray
Beach |
Looking
at the West Platform in Delray Beach, the old platform has been
removed and a new one lining up with the rest of the platform will
be poured, in the mean time all trains arrive and depart from the
East Platform |
07/08/04 |
 |
Delray
Beach |
07/08/04 |
 |
Delray
Beach |
Looking
North along the Right of Way, the NB Intermediate to Boynton and
SB Distant to Yamato has been relocated alongside the new track |
07/08/04 |
 |
Ft.
Lauderdale |
One of the newer stations that
just opened in 1996. It'll have to be retrofitted for Double
Tracking |
April
2002 |
 |
Ft.
Lauderdale |
The
new stairwell has started to go up in Ft. Lauderdale, looks
identical to nearly all the other stairwells being erected on the
Tri-Rail system |
04/24/04 |
 |
Ft.
Lauderdale |
Reminds
you of the Led Zeppelin song stairway to heaven doesn't it? |
04/24/04 |
 |
Ft.
Lauderdale |
Land
is being cleared for the new East Platform, this is one of the few
locations where the tracks that will be used for both platforms is
already in place, the track that will serve the East Platform
(Track 1) is currently a CSX freight lead, you know the CSX yard
crews have to be thrilled with haveing a platform on either side
of their workspace |
04/24/04 |
 |
Ft.
Lauderdale |
 |
Ft.
Lauderdale |
East
Stairwell at Ft. got a new piece of hardware added to it since
April |
05/30/04 |
 |
Ft.
Lauderdale |
The
overhead bridge stretches across the exsisting platform, main
track, and CSX yard track |
05/30/04 |
 |
Ft.
Lauderdale |
The
overhang hardware is starting to go onto the East Stairwell |
06/11/04 |
 |
Ft.
Lauderdale |
Not
much movement on the east platform |
06/11/04 |
 |
Ft.
Lauderdale |
Looking
at the bridge as morning commuters mull around the station |
06/11/04 |
 |
Ft.
Lauderdale |
No
station is complete without some trees |
06/11/04 |
 |
Ft.
Lauderdale |
Looking
south towards the New River drawbridge, we can see P608's
headlight off in the distance |
06/11/04 |
 |
Ft.
Lauderdale |
Morning
commuters anxiously wait for P607, who's currently 15 minutes
behind schedule |
06/11/04 |
 |
Lake
Worth |
Working
on lowering that east stairwell by 18" to get it in
regulation |
09/20/03 |
 |
Lake
Worth |
The
overhead canopy has been removed the day before because it was
18" to tall |
09/20/03 |
 |
Lake
Worth |
Looking
down towards the canopy being installed for the West Platform
(Track 1) |
09/20/03 |
 |
Lake
Worth |
Putting
up the cage on the bridge so it can be hoisted back up atop the
stairwells once they have been sunk down |
09/20/03 |
 |
Lake
Worth |
 |
Lake
Worth |
Bridge
is back up in Lake Worth as they work on the rest of the station |
11/09/03 |
 |
Miami
International |
Not
much here, ticket booth, restrooms, vending machines, and a crew
room |
09/20/03 |
 |
Miami
International |
A
very nice shady canopy, the Hertz Rental car garage is in the
background, the station can accomodate two trains so that when one
is getting ready to go out of service its replacement can be in
the station |
09/20/03 |
 |
Miami
International |
Stub
end on Track 1 at Miami International |
09/20/03 |
 |
Miami
International |
Looking
towards the airport, just off the horizon |
09/20/03 |
 |
Opa
Locka |
West
Platform at Opa Locka, not used right now because of a lack of a
platform at Golden Glades for that new track, and no crossovers in between
to let trains switch from the new track to the old for platform
use at Golden Glades |
11/09/03 |
 |
Sheridan
Street |
Construction
is obviously under way at Shridan Street in the Double Tracking
process |
09/20/03 |
 |
Sheridan
Street |
Very
shady at Sheridan Street, making it a nice retreat from the heat
of a Saturday afternoon |
09/20/03 |
 |
West
Palm Beach |
West
Palm Beach mainline has been torn out and is being rebalasted and
new concrete ties are being installed, all trains will work from
the siding while they work on replacing the mainline, the whole
process is expected to take 20 days in total |
08/11/03 |
 |
West
Palm Beach |
 |
West
Palm Beach |
A
Tri County Rail Constructors Track Mobile sits on the main in West
Palm with Herzog ballast cars coupled up |
09/06/03 |
 |
West
Palm Beach |
The
new main is down, and the old canopy is gone, it looks like from
the drawings Main 1 (Main 2 is in the foreground) will go where
the old platform was, and the new platform will go where the
siding is, this is unconfirmed, but thats the way it looks. |
09/20/03 |
 |
West
Palm Beach |
They've
begun to pour the first part of the new platform, the entire thing
cannot be poured until the old platform can be completely
demolished, which won't happen until they can put this platfrom
into service |
11/23/03 |
 |
West
Palm Beach |
A
look at the connection between what will be the new main and the
old siding |
11/23/03 |
 |
West
Palm Beach |
Looking
at the main building of the West Palm Beach Station, Amtrak,
Tri-Rail, Greyhound, and even a small resturant are all housed in
this one building |
01/19/04 |
 |
West
Palm Beach |
They've
begun to build the West Stairwell for the Pedestrian Bridge tower,
the new West Platform will not open until the Pedestrian Bridge is
done |
01/19/04 |
 |
West
Palm Beach |
After
looking at the plans for the station, this is one of the few
stations where the architecture fits with the area, the design is
very unique, and will closely resemble that of the exsisting
station building, here we see the West Stairwell rising toward the
sky |
04/24/04 |
 |
West
Palm Beach |
The
Platform has been poured, and now the canopy begins to go up,
still waiting for the north end of the platform to be put down |
04/24/04 |